INSP - Final | 8/7/1998 | 8/7/1998 | 8/7/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Energy code compliance | 4/17/1998 | 4/17/1998 | 4/17/1998 | P | PASS |
Carl Dependahl
|
|
|
###-####/BRET INSULATION INSPECTION.
|
INSP - Framing/Rough-in | 4/17/1998 | 4/17/1998 | 4/17/1998 | P | PASS |
Carl Dependahl
|
|
|
reinsp
|
INSP - Framing/Rough-in | 4/15/1998 | 4/15/1998 | 4/15/1998 | A | NR |
Carl Dependahl
|
|
|
no insp, conf w/ owner re c/n...ok to insulate.
|
INSP - Framing/Rough-in | 4/8/1998 | 4/9/1998 | 4/9/1998 | P | PART |
Carl Dependahl
|
|
|
###-#### HELEN...keep c/n ok to insulate
|
INSP - Framing/Rough-in | 4/7/1998 | 4/8/1998 | 4/8/1998 | A | NR |
Carl Dependahl
|
|
|
###-#### COBLER... w/ owner, need complete previous c/n
|
INSP - Framing/Rough-in | 4/3/1998 | 4/3/1998 | 4/3/1998 | A | PART |
Carl Dependahl
|
|
|
keep c/n, not insp...conf w/ owner
|
INSP - Framing/Rough-in | 3/26/1998 | 3/26/1998 | 3/26/1998 | P | FAIL |
Carl Dependahl
|
|
|
HELEN ###-####... need complete nailing at shear panels, straps, block/ brace trusses as needed, etc. complete prior c/n....homeowner as contractor
|
INSP - Framing/Rough-in | 2/9/1998 | 2/10/1998 | 2/10/1998 | P | NR |
Wes Worcester
|
|
|
HELEN ###-####
|
INSP - Carpentry | 1/16/1998 | 1/16/1998 | 1/16/1998 | P | PART |
Carl Dependahl
|
|
|
CHK PROGRESS
|
INSP - Carpentry | 12/18/1997 | 12/18/1997 | 12/18/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - WROTE C/N RE TRUSSES, FIREBLOCKS, ROOF FRAMING, WALL BRACING ETC...NEED ENG'G
|
INSP - Framing/Rough-in | 12/16/1997 | 12/17/1997 | 12/18/1997 | A | NR |
Carl Dependahl
|
|
|
12/18/97 340 - NR, NEED PLAN
|
INSP - Carpentry | 12/3/1997 | 12/4/1997 | 12/4/1997 | A | PART |
Wes Worcester
|
|
|
12/04/97 342 - truss eng not done, shear nailing not done, otherwise loo
|
INSP - Carpentry | 11/19/1997 | 11/19/1997 | 11/19/1997 | P | NR |
Carl Dependahl
|
|
|
NEED APPROVED PLAN & TRUSS CALCS...TOLD TO ADD BLOCKING AT SHEAR EDGES...FIREBLOCKS, ETC
|
INSP - Carpentry | 11/19/1997 | 11/18/1997 | 11/18/1997 | P | PART |
Carl Dependahl
|
|
|
DISCUSSED FIREBLOCKING, BRACING, OTHER FRAMING ISSUES W/ OWNER-BLDRS SON
|
INSP - Foundation | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | PASS |
Carl Dependahl
|
|
|
DID NOT HAVE BRACING REQUIREMENTS DETERMINED AT FOOTING. SUPPOSED TO BE THERE AT FOUNDATION INSPECTION...INSTALLED HD'S, HAS ARCH'S REDLINED PLAN ONSITE CALLING OUT SHEAR PANELS.
|
INSP - Conference | 7/22/1997 | 7/23/1997 | 7/23/1997 | A | PASS |
Wes Worcester
|
|
|
after 9 a.m. need bracing requirements, call for ftg and fdn, note 24" requirement below final grade...soils looked ok
|