INSP - Final | 8/31/1999 | 8/31/1999 | 8/31/1999 | | PASS |
Jim Storey
|
|
|
archived engineering letter
|
INSP - Final | 12/15/1998 | 12/16/1998 | 12/16/1998 | P | PASS |
Jim Storey
|
|
|
12/16/98 301 - FNL -OK FINAL
|
INSP-Final Inspection | 12/15/1998 | 12/16/1998 | 12/16/1998 | A | PASS |
Rick Jackson
|
|
|
###-#### occ approved
|
INSP - Final | 8/12/1998 | 8/13/1998 | 8/13/1998 | P | PART |
Jim Storey
|
|
|
BRUCE ###-#### temp occ. ok pending fire sign off
|
INSP-Final Inspection | 8/12/1998 | 8/13/1998 | 8/13/1998 | A | PART |
Rick Jackson
|
|
|
10:00 AS PER RICK/BRUCE ###-#### alarm panel has one "trouble"; complete installation of dampers in core;
|
INSP - Final | 8/11/1998 | 8/12/1998 | 8/12/1998 | P | FAIL |
Jim Storey
|
|
|
08/12/98 301 - bruce ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 8/11/1998 | 8/12/1998 | 8/12/1998 | P | FAIL |
Rick Jackson
|
|
|
SHELL AND CORE FINAL BRUCE ###-#### alarms not working; elevator recall not complete; dry sprinkler test failed time;
|
INSP-Conference | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | FAIL |
Jim Storey
|
|
|
07/16/98 301 - conf. check with rick on time/ ###-#### cathy reed CORR-CORREC-CALL FOR REINSP WHEN COMPLETED furing and wood trim above ce must be procteced or non combustable.
|
INSP-Conference | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | PART |
Rick Jackson
|
|
|
check with jim to see time/ ###-#### cathy reed signage for riser room and fire control room
|
INSP-Sprinkler Rough-in/Hydro | 7/16/1998 | 7/16/1998 | 7/16/1998 | A | PART |
Rick Jackson
|
|
|
3rd hydro okay. 2nd floor and 1st floor will still need hydro - drops for heads not cut to proper length and minor leaks
|
INSP - Framing/Rough-in | 6/9/1998 | 6/9/1998 | 6/9/1998 | P | |
Jim Storey
|
|
|
reinspection on roof/ladder available/bruce ###-####
|
INSP - Framing/Rough-in | 6/4/1998 | 6/4/1998 | 6/2/1998 | P | PART |
Jim Storey
|
|
|
06/04/98 301 - nailling at top of hip set to micro needed
|
INSP-Sprinkler Rough-in/Hydro | 5/22/1998 | 5/22/1998 | 5/22/1998 | P | PASS |
Rick Jackson
|
|
|
underground hydro pass.
|
INSP - Framing/Rough-in | 5/20/1998 | 5/20/1998 | 5/20/1998 | P | FAIL |
Jim Storey
|
|
|
05/20/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 5/18/1998 | 5/18/1998 | 5/18/1998 | P | PASS |
Jim Storey
|
|
|
05/18/98 301 - roof nailling ok for cover
|
INSP - Framing/Rough-in | 5/8/1998 | 5/8/1998 | 5/8/1998 | P | CANC |
Russ Owen
|
|
|
05/08/98 407 - this has been done am by 301.
|
INSP - Framing/Rough-in | 5/8/1998 | 5/8/1998 | 5/8/1998 | | PART |
Jim Storey
|
|
|
/ / 301 - NORTH WEST ROOF NAILLING OK
|
INSP - Framing/Rough-in | 5/6/1998 | 5/6/1998 | 5/6/1998 | P | PART |
Jim Storey
|
|
|
05/06/98 301 - ROOF NAILLING NORTH SIDE OK
|
INSP-Sprinkler Rough-in/Hydro | 5/4/1998 | 5/4/1998 | 5/4/1998 | P | PART |
Rick Jackson
|
|
|
third floor, attic, elevator and stairwells not complete. 1st and second okay. main riser not complete.
|
INSP-Supply line flush | 5/4/1998 | 5/4/1998 | 5/4/1998 | P | PASS |
Rick Jackson
|
|
|
underground flush. shilo rep turned on curb valve - he said united water told him it was okay
|
INSP - Foundation | 4/14/1998 | 4/15/1998 | 4/15/1998 | A | PART |
Jim Storey
|
|
|
04/15/98 301 - pending special insp.
|
INSP - Concrete | 3/18/1998 | 3/19/1998 | 3/20/1998 | A | FAIL |
Jim Storey
|
|
|
03/20/98 301 - c/n requisted arch. to adress floor wall const. joint.PER
|
INSP - Concrete | 3/16/1998 | 3/17/1998 | 3/17/1998 | P | PART |
Jim Storey
|
|
|
03/17/98 301 - Scheduled by Hello!. FRMS-OK FORMS-REBAR special insp. pending report
|
INSP - Foundation | 3/13/1998 | 3/16/1998 | 3/16/1998 | A | PASS |
Jim Storey
|
|
|
03/16/98 301 - slab 3rd floor bruce ###-#### FRMS-OK FORMS-REBAR
|
INSP - Concrete | 3/10/1998 | 3/10/1998 | 3/10/1998 | P | PASS |
Jim Storey
|
|
|
03/10/98 301 - 2nd floor slab bruce ###-#### FRMS-OK FORMS-REBAR
|
INSP - Foundation | 3/5/1998 | 3/6/1998 | 3/6/1998 | A | PASS |
Jim Storey
|
|
|
03/06/98 301 - bruce ###-#### deck pour FRMS-OK FORMS-REBAR 1st floor deck grid 1-5 a/c lines pending special in report.
|
INSP - Framing/Rough-in | 2/25/1998 | 2/27/1998 | 2/27/1998 | A | NR |
Tom Arcoraci
|
|
|
bruce ###-#### TALKED TO SPECIAL INSP OK TO DATE
|
INSP - Foundation | 1/16/1998 | 1/20/1998 | 1/20/1998 | A | PASS |
|
|
|
01/20/98 333 - FDN -OK FOUNDATION pend spec insp report
|
INSP - Foundation | 1/13/1998 | 1/13/1998 | 1/13/1998 | A | PART |
Jim Storey
|
|
|
01/13/98 301 - ###-####-Bruce covered with special insp.
|
INSP - Foundation | 12/31/1997 | 1/5/1998 | 1/5/1998 | P | PASS |
Jim Storey
|
|
|
01/05/98 301 - special insp on site ok pending report
|