INSP-Conference | 6/28/1999 | 6/28/1999 | 6/28/1999 | | PART |
|
|
|
with 305, 333 and drs looked through the copys of partial plans both projects also copied plans and plan review notes for reference. will talk to 409 on the fire life safety issues and then contact project site to gain access to inspect for possibility of finaling out the project if is per the approved plans on file.
|
INSP-Final Inspection | 2/20/1998 | 2/23/1998 | 2/24/1998 | P | PART |
Rick Jackson
|
|
|
02/23/98 409 - ###-#### conf. discussed 6 ft 8 inch height in stairwell, structurally they can only ge clearance. turned over to Kim M. they will submit letter to request exemption.
|
INSP-Final Inspection | 2/18/1998 | 2/20/1998 | 2/20/1998 | P | NH |
Joe Tawney
|
|
|
02/20/98 406 - TOM ###-####--CONFERENCE CALLED TOM NO ANSWER WENT TO SITE TOM NOT THERE
|
INSP - Framing/Rough-in | 8/6/1997 | 8/7/1997 | 8/7/1997 | A | PASS |
|
|
|
08/07/97 333 - 8 am FRAM-OK FRAMING electrical surface mounted
|
INSP - Framing/Rough-in | 8/5/1997 | 8/6/1997 | 8/6/1997 | A | PART |
|
|
|
08/06/97 333 - will do tomorrow per contractor
|