INSP - Grading Inspection | 7/23/1998 | | 7/23/1998 | | PASS |
Rita DeYoung
|
|
|
Landscaping completed. Released $2140.00 bond.
|
INSP - Final | 4/20/1998 | 4/20/1998 | 4/20/1998 | P | FAIL |
Wes Worcester
|
|
|
04/20/98 342 - bond still not posted Contact phone is [8703339].
|
INSP - Final | 4/20/1998 | 4/20/1998 | 4/20/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Final | 4/16/1998 | 4/17/1998 | 4/17/1998 | P | FAIL |
Wes Worcester
|
|
|
04/17/98 342 - need mechanical, need public wks, caulk boots to deck, in caulk garage penetrations w/rated assembly.
|
INSP - Grading Inspection | 4/17/1998 | | 4/17/1998 | | BOND |
Rita DeYoung
|
|
|
Fine grading has been completed in substantial compliance to the approved plan. Some retaining walls have been added that are less than 4 feet high. Additional incomplete work includes final revegetation and a retaining wall at the rear of the lot for which the engineer has recommended a $2140.00 bond. This amount is approved and the Letter of Compliance can be issued upon receipt of this bond.
|
INSP - Energy code compliance | 1/7/1998 | 1/8/1998 | 1/8/1998 | A | PASS |
Tom Arcoraci
|
|
|
01/08/98 408 -
|
INSP - Conference | 1/5/1998 | 1/5/1998 | 1/5/1998 | P | PASS |
Carl Dependahl
|
|
|
W/ CONTRACTOR RE MECH C/N
|
INSP - Framing/Rough-in | 12/31/1997 | 1/2/1998 | 1/2/1998 | A | CANC |
Carl Dependahl
|
|
|
CANC PER RITA
|
INSP - Conference | 12/16/1997 | 12/16/1997 | 12/16/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - getting mech permit, electrical has ok to insulate, starting
|
INSP - Conference | 12/16/1997 | 12/16/1997 | 12/16/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - getting mech permit, electrical has ok to insulate, starting
|
INSP - Miscellaneous | 12/15/1997 | 12/16/1997 | 12/16/1997 | A | PASS |
Wes Worcester
|
|
|
12/16/97 342 - SHEAR WALL NAIL/ REMEMBER , YOU HAVE APT. FOR 11:00 TO 11
|
INSP - Carpentry | 12/12/1997 | 12/12/1997 | 12/12/1997 | | NR |
Wes Worcester
|
|
|
/ / 342 - nail shr as per eng and in genaral
|
INSP - Conference | 12/11/1997 | 12/12/1997 | 12/12/1997 | A | PASS |
Wes Worcester
|
|
|
12/12/97 342 - michael will call you for a time
|
INSP - Foundation | 10/17/1997 | 10/20/1997 | 10/20/1997 | A | PASS |
Wes Worcester
|
|
|
10/20/97 342 - wall will pour at 10:30
|
INSP - Conference | 10/15/1997 | 10/15/1997 | 10/15/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - discussed tying rebar in place 32" oc, will be ready later..
|
INSP - Footings | 10/15/1997 | 10/15/1997 | 10/15/1997 | P | NR |
Wes Worcester
|
|
|
10/15/97 342 - READY AT 3:30 ì
|
INSP - Footings | 10/15/1997 | 10/15/1997 | 10/15/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - 8:30 am apt
|