INSP - Final | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | PASS |
Wes Worcester
|
|
|
04/28/98 342 - Final - Tom @ ###-#### - call 1st 11 am apt
|
INSP - Final | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | CANC |
Wes Worcester
|
|
|
Final - call 1st at ###-#### or ###-#### - Tom DeLorenzo
|
INSP - Grading Inspection | 4/9/1998 | | 4/9/1998 | | BOND |
Rita DeYoung
|
|
|
Fine grading has been comnpleted. Revegetaion,driveway,and drainage system has not been completed. Engineer has recommended a $3990.00 bond for this uncompleted work. When this is received the house can be given a letter of compliance.
|
INSP - Energy code compliance | 1/2/1998 | 1/5/1998 | 1/5/1998 | A | FAIL |
Tom Arcoraci
|
|
|
OK FOR COVER AFTER PLUMBING ROUGH OK
|
INSP - Framing/Rough-in | 12/23/1997 | 12/24/1997 | 12/24/1997 | A | PASS |
Wes Worcester
|
|
|
12/24/97 342 -
|
INSP - Carpentry | 12/1/1997 | 12/2/1997 | 12/2/1997 | A | PASS |
Wes Worcester
|
|
|
12/01/97 342 - shear ok
|
INSP - Footings | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | NR |
Wes Worcester
|
|
|
CALL BACK IN WHEN REBAR IS PLACED
|
INSP - Footings | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PART |
Wes Worcester
|
|
|
need compaction report on site
|
INSP - Footings | 9/19/1997 | 9/19/1997 | 9/19/1997 | | NH |
Wes Worcester
|
|
|
/ / 342 - still need soils report, rebar not placed, no one on site
|
INSP - Footings | 9/19/1997 | 9/19/1997 | 9/19/1997 | P | NR |
Wes Worcester
|
|
|
09/19/97 342 - need soils report for compacted ground
|
INSP - Footings | 9/2/1997 | 9/3/1997 | 9/3/1997 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Footings | 8/25/1997 | 8/25/1997 | 8/25/1997 | P | NR |
Wes Worcester
|
|
|
needs to dig out rebar from sand that has caved in on pour
|
INSP - Footings | 8/15/1997 | 8/18/1997 | 8/20/1997 | P | PART |
Wes Worcester
|
|
|
08/20/97 342 - after 2 P.M.
|