INSP - Final | 12/3/1997 | 12/4/1997 | 12/4/1997 | A | PASS |
Russ Owen
|
|
|
EARLY AS POSSIBLE PLEASE
|
INSP - Letter of compliance | 12/5/1997 | 12/4/1997 | 12/4/1997 | | PASS |
Russ Owen
|
|
|
LC#12776
|
INSP - Final | 12/2/1997 | 12/2/1997 | 12/2/1997 | P | PART |
Russ Owen
|
|
|
left correction.
|
INSP - Energy code compliance | 10/3/1997 | 10/6/1997 | 10/6/1997 | A | PASS |
Russ Owen
|
|
|
10/06/97 407 - Scheduled by Hello! on 10/03/97 at 15:29:22.
|
INSP - Framing/Rough-in | 10/6/1997 | 10/6/1997 | 10/6/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - re-inspection.
|
INSP - Framing/Rough-in | 10/1/1997 | 10/1/1997 | 10/2/1997 | P | PART |
Russ Owen
|
|
|
10/01/97 407 - left correction.
|
INSP - Framing/Rough-in | 9/29/1997 | 9/30/1997 | 9/30/1997 | A | NR |
Russ Owen
|
|
|
09/30/97 407 - LATE AM PLEASE need the mechanical finished.
|