INSP - Final | 10/15/1997 | 10/15/1997 | 10/15/1997 | P | PASS |
Russ Owen
|
|
|
10/15/97 407 - rein
|
INSP - Letter of compliance | 10/15/1997 | 10/15/1997 | 10/15/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#014019
|
INSP - Letter of compliance | 10/15/1997 | 10/15/1997 | 10/15/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#014019
|
INSP - Final | 10/10/1997 | 10/14/1997 | 10/14/1997 | A | FAIL |
Russ Owen
|
|
|
10/14/97 407 - left corrections.
|
INSP - Framing/Rough-in | 9/15/1997 | 9/16/1997 | 9/16/1997 | A | PASS |
Russ Owen
|
|
|
09/16/97 407 - reinspection framing around gas log pipe.
|
INSP - Framing/Rough-in | 9/11/1997 | 9/11/1997 | 9/11/1997 | | PART |
Russ Owen
|
|
|
/ / 407 - re-inspection. corrections done, the gas log has been change chase will be built above ,ok to sheetrock all area except for the above gas log. left a notice.
|
INSP - Framing/Rough-in | 9/4/1997 | 9/4/1997 | 9/4/1997 | P | FAIL |
Russ Owen
|
|
|
09/04/97 407 -
|
INSP - Framing/Rough-in | 9/2/1997 | 9/3/1997 | 9/4/1997 | P | NR |
Russ Owen
|
|
|
09/03/97 407 - NEED MECHANICAL AND ELECTRICAL.
|
INSP - Framing/Rough-in | 8/29/1997 | 9/3/1997 | 9/2/1997 | A | CANC |
Russ Owen
|
|
|
CHANGED FROM A.M. TO P.M.
|
INSP - Footings | 7/31/1997 | 7/31/1997 | 7/31/1997 | P | CANC |
Russ Owen
|
|
|
07/31/97 407 - see am inspection done then footings only.
|
INSP - Footings | 7/31/1997 | 7/31/1997 | 7/31/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - exterior footings ok. told foundation contractor to check wi if any straps would be required. Note this is a early start permit. with no city approved plans.
|