INSP - Foundation | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | PASS |
Carl Dependahl
|
|
|
not entered w/ other townhouse at time of insp...ok.
|
INSP - Foundation | 10/19/1998 | | 10/19/1998 | | PASS |
|
|
|
OK, NOT ENTERED DATE OF INSP, CALLED W/ OTHER TOWNHSE UNITS.
|
INSP - Letter of compliance | 12/18/1997 | 12/18/1997 | 12/18/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - LC 015401
|
INSP - Letter of compliance | 12/18/1997 | 12/18/1997 | 12/18/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - LC 015401
|
INSP - Final | 12/17/1997 | 12/17/1997 | 12/18/1997 | P | PASS |
Carl Dependahl
|
|
|
12/18/97 340 - OK
|
INSP - Energy code compliance | 11/21/1997 | 11/21/1997 | 11/21/1997 | P | PART |
Carl Dependahl
|
|
|
PART, NEED INS AT GAR, HAS ELEC & MECH C/N AT SAME. OK TO COVER HOUSE ONLY.
|
INSP - Framing/Rough-in | 11/21/1997 | 11/21/1997 | 11/21/1997 | P | PART |
Carl Dependahl
|
|
|
REINSP ...OK TO COVER EXCEPT GAR, NEED ELEC OK THERE. ALSO, NEED FURNACE PLENUM MOVED TO FASTEN GYP AT 1HR WALL...
|
INSP - Framing/Rough-in | 11/19/1997 | 11/19/1997 | 11/19/1997 | P | FAIL |
Carl Dependahl
|
|
|
ask cont about reinsp fee...HAS ELEC & MECH C/N...NEED SEAL 1HR CONST. ETC, OK TO INSUL
|