INSP - Final | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
Tom Arcoraci
|
|
|
|
INSP - Final | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | CANC |
Jim Sly
|
|
|
09/23/97 316 - Gave to Tom A.
|
INSP - Final | 9/22/1997 | 9/23/1997 | 9/23/1997 | A | FAIL |
Jim Sly
|
|
|
09/22/97 316 - C/N...Load hinges, foam seal can lights attic access.....
|
INSP - Letter of compliance | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
Tom Arcoraci
|
|
|
|
INSP - Energy code compliance | 8/28/1997 | 8/29/1997 | 8/29/1997 | P | PASS |
Jim Sly
|
|
|
08/29/97 316 -
|
INSP - Framing/Rough-in | 8/29/1997 | 8/29/1997 | 8/29/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 8/29/1997 | 8/29/1997 | 8/29/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 8/28/1997 | 8/28/1997 | 8/28/1997 | P | FAIL |
Jim Sly
|
|
|
08/28/97 316 - Needs mech R I
|
INSP - Footings | 8/13/1997 | 8/13/1997 | 8/13/1997 | P | FAIL |
Jim Sly
|
|
|
08/13/97 316 - Poured W/O inspection...
|