INSP - Final | 3/13/1998 | 3/13/1998 | 3/16/1998 | P | PASS |
Russ Owen
|
|
|
03/13/98 407 - re-insp ,rear upper deck is being raised to minimum 36".a was a correction. LC#15541.
|
INSP - Final | 3/12/1998 | 3/13/1998 | 3/13/1998 | A | CANC |
Russ Owen
|
|
|
03/13/98 407 - contractor has called and I have refered him to my Bob A, deals I said he would need to talk with Bob.
|
INSP - Final | 3/11/1998 | 3/11/1998 | 3/11/1998 | P | FAIL |
Russ Owen
|
|
|
03/11/98 407 - left corrections.
|
INSP - Framing/Rough-in | 11/10/1997 | 11/12/1997 | 11/12/1997 | A | FAIL |
Jim Storey
|
|
|
11/12/97 301 - REINSP CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Energy code compliance | 11/6/1997 | 11/7/1997 | 11/7/1997 | A | PASS |
Russ Owen
|
|
|
11/07/97 407 - ok except still has framing corrections.
|
INSP - Framing/Rough-in | 11/6/1997 | 11/7/1997 | 11/7/1997 | A | FAIL |
Russ Owen
|
|
|
11/07/97 407 - still has engineering needed will submit a letter.
|
INSP - Framing/Rough-in | 11/3/1997 | 11/4/1997 | 11/4/1997 | A | PART |
Tom Arcoraci
|
|
|
needs stamped eng and wattsun then inspection of hold downs ok to cover but hold off garage ceiling and walls where hold downs are
|
INSP - Framing/Rough-in | 10/28/1997 | 10/28/1997 | 10/28/1997 | P | FAIL |
Russ Owen
|
|
|
left corrections,also the engineering with plans is not correct and i have requested that the engineer approve the home as built.
|
INSP - Footings | 9/11/1997 | 9/11/1997 | 9/11/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - re-inspection, footing has 2-#4 continous horizontal,plans d any.
|
INSP - Footings | 9/9/1997 | 9/10/1997 | 9/10/1997 | A | NR |
Russ Owen
|
|
|
09/10/97 407 - FIRST THING no plans on site also the rebar does not have clearance ,appears to not ready for inspection .left correctios.
|