INSP - Final | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | PASS |
|
|
|
11/14/97 333 - FNL -OK FINAL
|
INSP - Letter of compliance | 11/14/1997 | 11/14/1997 | 11/14/1997 | | PASS |
|
|
|
/ / 333 - LETTER#12975
|
INSP - Letter of compliance | 11/14/1997 | 11/14/1997 | 11/14/1997 | | PASS |
|
|
|
/ / 333 - LETTER#12975
|
INSP - Final | 11/13/1997 | 11/13/1997 | 11/13/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - BCEC NOT FINISHED, EXPOSED CELOTEX
|
INSP - Final | 11/13/1997 | 11/13/1997 | 11/13/1997 | P | FAIL |
Jim Storey
|
|
|
11/13/97 301 - trans to wes
|
INSP - Final | 11/10/1997 | 11/12/1997 | 11/12/1997 | A | CANC |
Jim Storey
|
|
|
11/12/97 301 - trans to WES W
|
INSP - Energy code compliance | 10/17/1997 | 10/17/1997 | 10/17/1997 | P | PART |
Russ Owen
|
|
|
10/17/97 407 - contractor to provide mec check or watsun said it was at called for high r at garage wall which has been put in.
|
INSP - Framing/Rough-in | 10/17/1997 | 10/17/1997 | 10/17/1997 | P | PASS |
Russ Owen
|
|
|
10/17/97 407 - EINSPECTION
|
INSP - Framing/Rough-in | 10/16/1997 | 10/16/1997 | 10/16/1997 | P | NR |
Russ Owen
|
|
|
10/16/97 407 - all corrections have not been completed and insulation cr i called john of stetson and left message to call me back.
|
INSP - Framing/Rough-in | 10/15/1997 | 10/15/1997 | 10/15/1997 | P | FAIL |
Russ Owen
|
|
|
10/15/97 407 - REINSPECTION left corrections.
|
INSP - Framing/Rough-in | 10/10/1997 | 10/13/1997 | 10/13/1997 | A | FAIL |
Russ Owen
|
|
|
10/13/97 407 - I was out 10/10/97, told contractor to have approved plan mechanical completed,before a framing inspection, Still not done,left a re-inspection fee.
|
INSP - Framing/Rough-in | 10/9/1997 | 10/9/1997 | 10/9/1997 | P | NR |
Russ Owen
|
|
|
10/09/97 407 - not ready no plans or truss details also gas pipe has not rogh-in not complete,hvac still on site.
|
INSP - Footings | 8/28/1997 | 8/29/1997 | 8/29/1997 | A | PART |
Russ Owen
|
|
|
08/29/97 407 - poured before inspection and no plans on site. early star
|