INSP - Final | 12/9/1997 | 12/9/1997 | 12/9/1997 | P | PASS |
Russ Owen
|
|
|
12/09/97 407 -
|
INSP - Letter of compliance | 12/9/1997 | 12/9/1997 | 12/9/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#12770
|
INSP - Letter of compliance | 12/9/1997 | 12/9/1997 | 12/9/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#12770
|
INSP - Final | 12/8/1997 | 12/8/1997 | 12/8/1997 | P | FAIL |
Russ Owen
|
|
|
12/08/97 407 - LEFT CORRECTIONS
|
INSP - Framing/Rough-in | 10/17/1997 | 10/20/1997 | 10/20/1997 | P | PASS |
|
|
|
10/20/97 333 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 10/16/1997 | 10/17/1997 | 10/17/1997 | P | FAIL |
Russ Owen
|
|
|
10/17/97 407 - left corrections.
|
INSP - Footings | 9/8/1997 | 9/8/1997 | 9/8/1997 | P | CANC |
Russ Owen
|
|
|
transfer to Tom A.
|
INSP - Footings | 9/8/1997 | 9/8/1997 | 9/8/1997 | P | FAIL |
Tom Arcoraci
|
|
|
poured without inspec no plans no prop lines
|