BLD-Final | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | FAIL |
|
|
|
skip ###-#### Still need P/Z ACHD.
|
BLD-Final | 12/2/1999 | 12/3/1999 | 12/3/1999 | P | FAIL |
|
|
|
###-#### LATE PM Cancelled by contractor.
|
FIRE-Final Inspection | 11/30/1999 | 11/30/1999 | 11/30/1999 | P | PASS |
Rick Jackson
|
|
|
|
INSP - Final | 4/16/1999 | 4/21/1999 | 4/23/1999 | P | PART |
|
|
|
04/26/99 338 - ok for str with fire ok
|
INSP-Final Inspection | 4/22/1999 | 4/22/1999 | 4/22/1999 | P | PART |
Rick Jackson
|
|
|
temp occ approved for shell; door holder at south end; basement doors and corridor not used or complete; perm address's;
|
INSP-Final Inspection | 4/21/1999 | 4/21/1999 | 4/21/1999 | P | FAIL |
Rick Jackson
|
|
|
tested more alarms - okay; damper not working; retest exit and emergency lights; knox box; etc. c/n issued
|
INSP-Final Inspection | 4/16/1999 | 4/20/1999 | 4/16/1999 | P | |
Rick Jackson
|
|
|
3:00
|
INSP - Final | 4/13/1999 | 4/14/1999 | 4/14/1999 | P | FAIL |
|
|
|
need fire dept approval str walk through only with 306 and 340 04/14/99 338
|
INSP-Final Inspection | 4/13/1999 | 4/14/1999 | 4/14/1999 | P | FAIL |
Rick Jackson
|
|
|
04/14/99 409 - ###-#### SKIP//###-#### FIRE & LIFE SAFETY 1:00 dampers on 2nd not working; smoke detector in elevator shaft; NFPA 72; a
|
INSP-Final Inspection | 4/9/1999 | 4/12/1999 | 4/12/1999 | P | PART |
Rick Jackson
|
|
|
###-#### TRACY hydro of anti-freeze loop okay.
|
INSP-Conference | 3/30/1999 | 3/30/1999 | 3/30/1999 | A | PART |
Rick Jackson
|
|
|
profit meeting - requirements for shell and core were discussed
|
INSP-Alarm Testing | 3/3/1999 | 3/3/1999 | 3/3/1999 | P | |
|
|
|
exiting requirements ###-####, ###-#### Jack
|
INSP-Conference | 3/3/1999 | 3/3/1999 | 3/3/1999 | P | PART |
Rick Jackson
|
|
|
exiting sign requirements and corridor heights
|
INSP - Framing/Rough-in | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | PART |
|
|
|
03/01/99 338 - madok to drop in tiles this section
|
INSP - Framing/Rough-in | 2/25/1999 | 2/26/1999 | 2/26/1999 | P | CANC |
Rick Jackson
|
|
|
acoustic ceiling ###-#### Jack this inspection was for the structural inspector - not fire
|
INSP - Framing/Rough-in | 2/19/1999 | 2/22/1999 | 2/22/1999 | A | CANC |
Joe Tawney
|
|
|
02/22/99 406 - ###-#### overhead Tracy CANCELLED WILL BE RESCHEDULED
|
INSP - Framing/Rough-in | 2/1/1999 | 2/2/1999 | 2/22/1999 | A | PART |
|
|
|
02/02/99 338 - made ok to drop in tiles need to check for diffuser attac
|
INSP - Framing/Rough-in | 2/18/1999 | 2/19/1999 | 2/19/1999 | A | PART |
Jim Storey
|
|
|
02/19/99 301 - severce hall ceilling ok, corridor south pending mech, c/
|
INSP - Framing/Rough-in | 1/29/1999 | 1/29/1999 | 1/29/1999 | P | PART |
Carl Dependahl
|
|
|
01/29/99 340 - jack house- ###-#### -acostical ceil insp; ok to begin la recall for complete insp when ready
|
INSP - Framing/Rough-in | 1/15/1999 | 1/19/1999 | 1/19/1999 | A | PART |
|
|
|
01/19/99 338 - ok for to lay in the ceiling at the hall
|
INSP - Framing/Rough-in | 1/5/1999 | 1/6/1999 | 1/6/1999 | A | PASS |
|
|
|
01/06/99 333 - frame ok
|
INSP-Sprinkler Rough-in/Hydro | 1/5/1999 | 1/6/1999 | 1/6/1999 | A | FAIL |
Rick Jackson
|
|
|
01/06/99 409 - JACK- ###-#### R/I FOR FIRE basement area heqads still obstructed by conduit in bldg 2
|
INSP - Framing/Rough-in | 12/31/1998 | 12/31/1998 | 12/31/1998 | | PART |
|
|
|
12/31/98 333 - all but exterior walls on addition
|
INSP-Sprinkler Rough-in/Hydro | 12/21/1998 | 12/22/1998 | 12/22/1998 | P | FAIL |
Rick Jackson
|
|
|
Tracy wants an inspection at 1pm ###-#### basement not to cover corridor - hangers, wrong heads, conduit obstructing. second floor: steel brace causing overspacing,
|
INSP - Framing/Rough-in | 12/17/1998 | 12/18/1998 | 12/18/1998 | A | PART |
|
|
|
12/18/98 333 - NEED DETAIL AND ENGINEERING FOR CONNECTIONS AT NORTH WALL
|
INSP - Framing/Rough-in | 12/1/1998 | 12/2/1998 | 12/2/1998 | A | PART |
|
|
|
12/02/98 333 - restrooms and corridors ok
|
INSP - Framing/Rough-in | 10/13/1998 | 10/14/1998 | 10/14/1998 | P | PART |
|
|
|
10/14/98 333 - south end
|
INSP - Concrete | 10/8/1998 | 10/8/1998 | 10/8/1998 | P | PART |
Jim Storey
|
|
|
10/08/98 301 - jack ###-#### covered w/special insp. ì
|
INSP-Final Inspection | 10/7/1998 | 10/8/1998 | 10/8/1998 | P | PART |
Rick Jackson
|
|
|
TRACY ###-#### 3PM sprinkler rough-in only - okay to cover building 4 2nd floor
|
INSP - Concrete | 10/2/1998 | 10/2/1998 | 10/2/1998 | P | PART |
|
|
|
rebar ok
|
INSP - Concrete | 9/22/1998 | 9/23/1998 | 9/23/1998 | A | PART |
|
|
|
09/23/98 333 - north slab ok
|
INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 | P | PART |
|
|
|
09/22/98 333 - south roof and cn ok
|
INSP - Framing/Rough-in | 9/21/1998 | 9/21/1998 | 9/21/1998 | P | PART |
|
|
|
south half basement ok
|
INSP - Framing/Rough-in | 9/17/1998 | 9/17/1998 | 9/18/1998 | P | PART |
Jim Storey
|
|
|
09/17/98 301 - bldg#4 c/n basement restroom posted. ok for plumbing chas and all but west corner of basementc/n
|
INSP-Sprinkler Rough-in/Hydro | 9/11/1998 | 9/15/1998 | 9/15/1998 | P | FAIL |
Rick Jackson
|
|
|
TRACY ###-#### 1 PM bldg 4 - corridors require heads above grid (exposed combustibles), duct chase requires heads, space under loading dock needs sprinklers or combustibles covered, heads in bathrooms/corridor problems
|
INSP - Framing/Rough-in | 9/8/1998 | 9/8/1998 | 9/8/1998 | | PART |
|
|
|
09/08/98 333 - looked at wall locations
|
INSP - Framing/Rough-in | 9/4/1998 | 9/8/1998 | 9/8/1998 | A | PART |
|
|
|
09/08/98 333 - talked about wall locations
|
INSP - Foundation | 9/3/1998 | 9/4/1998 | 9/4/1998 | P | PASS |
|
|
|
09/04/98 333 - FRMS-OK FORMS-REBAR
|
INSP-Sprinkler Rough-in/Hydro | 8/31/1998 | 9/1/1998 | 9/1/1998 | A | PART |
Rick Jackson
|
|
|
9:00 AS PER 409 / TRACY ###-#### okay to cover bathrooms - sprinklers installed above hard lid
|
INSP-Sprinkler Rough-in/Hydro | 8/26/1998 | 8/28/1998 | 8/28/1998 | A | FAIL |
Rick Jackson
|
|
|
SPRINKLER OVERHEARD INSPECTION TRACY ###-#### concealed space in corridor and bathrooms not sprinklered above lid. not approved for cover until sprinklered
|
INSP-Conference | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
|
|
|
08/26/98 333 - firestopping issues
|
INSP - Concrete | 8/25/1998 | 8/25/1998 | 8/25/1998 | P | PART |
|
|
|
08/25/98 333 - pour ok
|
INSP - Framing/Rough-in | 8/20/1998 | 8/21/1998 | 8/21/1998 | A | PART |
|
|
|
08/21/98 333 - CORRIDORS SECOND AND FIRST FLOOR NORTH PLUSS BATHS ANS SO
|
INSP - Concrete | 8/18/1998 | 8/19/1998 | 8/19/1998 | A | PART |
|
|
|
08/19/98 333 - retain wall ok
|
INSP - Concrete | 8/13/1998 | 8/17/1998 | 8/17/1998 | A | PART |
|
|
|
08/17/98 333 - retaining wall
|
INSP - Concrete | 8/13/1998 | 8/14/1998 | 8/14/1998 | A | PART |
|
|
|
08/14/98 333 - ok pend spec insp reports
|
INSP - Concrete | 8/7/1998 | 8/7/1998 | 8/7/1998 | | PASS |
|
|
|
08/07/98 333 - moment frame ok
|
INSP - Concrete | 8/4/1998 | 8/7/1998 | 8/7/1998 | A | PART |
|
|
|
08/07/98 333 - moment frame foot ok
|
INSP - Concrete | 8/4/1998 | 8/6/1998 | 8/6/1998 | A | PART |
|
|
|
08/06/98 333 - moment frame foot ok pend spec insp reports
|
INSP - Framing/Rough-in | 8/5/1998 | 8/6/1998 | 8/6/1998 | A | PART |
|
|
|
08/06/98 333 - talked about damper and corridor requirements
|
INSP - Concrete | 8/4/1998 | 8/5/1998 | 8/5/1998 | A | PART |
|
|
|
08/05/98 333 - footing ok pend special insp
|
INSP - Foundation | 7/27/1998 | 7/31/1998 | 7/30/1998 | A | PART |
|
|
|
07/31/98 333 - exterior ok
|
INSP - Concrete | 7/29/1998 | 7/30/1998 | 7/30/1998 | A | PART |
|
|
|
07/30/98 333 - footing ok
|
INSP - Foundation | 7/27/1998 | 7/29/1998 | 7/29/1998 | A | PART |
|
|
|
07/30/98 333 - stem wall ok
|
INSP - Concrete | 7/22/1998 | 7/24/1998 | 7/24/1998 | A | PART |
Jim Storey
|
|
|
07/24/98 301 - jack ###-#### rebar concrete placed w/special insp.pending report.
|
INSP - Concrete | 7/21/1998 | 7/23/1998 | 7/23/1998 | A | PART |
Jim Storey
|
|
|
07/22/98 301 - rebar special inspector on site. ###-#### placed w/ special insp. pending report.
|
INSP - Concrete | 7/21/1998 | 7/21/1998 | 7/21/1998 | P | PART |
Jim Storey
|
|
|
07/21/98 301 - pending special insp.job re-bar ###-####
|
INSP - Foundation | 7/17/1998 | 7/20/1998 | 7/20/1998 | A | PART |
Jim Storey
|
|
|
07/20/98 301 - ready at 10 a.m. re-bar and concrete/ jack ###-#### FRMS-OK FORMS special insp report pending
|
INSP-Conference | 7/16/1998 | 7/16/1998 | 7/16/1998 | | PASS |
|
|
|
07/16/98 333 - talked corridors
|
INSP - Framing/Rough-in | 6/15/1998 | 6/15/1998 | 6/15/1998 | | PART |
|
|
|
/ / 333 - BOLTING EPOXY OK PEND SPECIAL INSP
|
INSP - Framing/Rough-in | 6/9/1998 | 6/9/1998 | 6/9/1998 | | PART |
|
|
|
/ / 333 - ROOF FRAMING COMPLETE
|
INSP - Framing/Rough-in | 6/8/1998 | 6/8/1998 | 6/8/1998 | | PART |
|
|
|
/ / 333 - ROOF ON NORTH HALF OK
|
INSP - Framing/Rough-in | 5/27/1998 | 5/27/1998 | 5/27/1998 | | PART |
|
|
|
/ / 333 - ROOF IN PROGRESS
|
INSP - Framing/Rough-in | 5/19/1998 | 5/19/1998 | 3/19/1998 | P | PART |
|
|
|
05/19/98 333 - north half of roof ok to cover
|