INSP - Final | 11/26/1997 | 11/28/1997 | 11/28/1997 | A | PASS |
Tom Arcoraci
|
|
|
|
INSP - Letter of compliance | 11/28/1997 | 11/28/1997 | 11/28/1997 | A | PASS |
Tom Arcoraci
|
|
|
15198
|
INSP - Final | 11/25/1997 | 11/26/1997 | 11/26/1997 | P | NH |
Jim Sly
|
|
|
11/26/97 316 - REINSPECTION No one on site ....no access...
|
INSP - Final | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | FAIL |
Jim Sly
|
|
|
11/24/97 316 - C/N...Need all trade finals...
|
INSP - Final | 11/24/1997 | 11/24/1997 | 11/24/1997 | | NR |
Jim Sly
|
|
|
11/21/97 316 - Builder cancelled
|
INSP - Final | 11/21/1997 | 11/24/1997 | 11/24/1997 | P | NR |
Jim Sly
|
|
|
11/24/97 316 - Builder cancelled at approx 9am....
|
INSP - Energy code compliance | 10/9/1997 | 10/9/1997 | 10/9/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 10/8/1997 | 10/9/1997 | 10/9/1997 | P | PASS |
Jim Sly
|
|
|
10/09/97 316 - RIEN OK
|
INSP - Framing/Rough-in | 10/7/1997 | 10/8/1997 | 10/8/1997 | P | FAIL |
Jim Sly
|
|
|
10/08/97 316 - C/N...Need mech rough in....
|
INSP - Footings | 9/12/1997 | 9/15/1997 | 9/15/1997 | A | FAIL |
Jim Sly
|
|
|
09/12/97 316 - Early start...Poured W/O inspection.
|