INSP - Final | 1/28/1998 | 1/28/1998 | 1/28/1998 | P | PASS |
Tom Arcoraci
|
|
|
01/28/98 408 - ###-#### pager ehc lock
|
INSP - Letter of compliance | 1/28/1998 | 1/28/1998 | 1/28/1998 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 - 14383
|
INSP - Letter of compliance | 1/28/1998 | 1/28/1998 | 1/28/1998 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 - 14383
|
INSP - Energy code compliance | 11/13/1997 | 11/14/1997 | 11/14/1997 | P | PASS |
Jim Sly
|
|
|
11/14/97 316 - late
|
INSP - Framing/Rough-in | 11/13/1997 | 11/13/1997 | 11/13/1997 | P | PASS |
Jim Sly
|
|
|
11/13/97 316 - REINSPECTION OK
|
INSP - Framing/Rough-in | 11/7/1997 | 11/10/1997 | 11/10/1997 | P | FAIL |
Jim Sly
|
|
|
11/10/97 316 - C/N...Need air infiltration pkg...plans..Misc truss corr.
|
INSP - Footings | 10/10/1997 | 10/13/1997 | 10/13/1997 | A | FAIL |
Jim Sly
|
|
|
10/10/97 316 - Poured W/O inspection...
|
INSP - Footings | 10/9/1997 | 10/13/1997 | 10/13/1997 | A | FAIL |
Jim Sly
|
|
|
10/13/97 316 - poured W/O inspection.
|
INSP - Footings | 10/9/1997 | 10/10/1997 | 10/10/1997 | A | FAIL |
Jim Sly
|
|
|
10/09/97 316 - Poured W/O inspection....
|