INSP - Grading Inspection | 7/7/1998 | | 7/7/1998 | | PASS |
Rita DeYoung
|
|
|
Driveway and final grading complete. $3550.00 bond can be released.
|
INSP - Final | 6/17/1998 | 6/17/1998 | 6/17/1998 | P | PASS |
Wes Worcester
|
|
|
/ / 342 - Scheduled by Hello!. Contact phone is [3713822].
|
INSP - Grading Inspection | 6/17/1998 | | 6/17/1998 | | BOND |
Rita DeYoung
|
|
|
Grading and reveg complete but driveway is not. Engineer recommnended $3550.00 bond. OK
|
INSP - Final | 6/15/1998 | 6/16/1998 | 6/16/1998 | A | NR |
Wes Worcester
|
|
|
06/16/98 342 - need p/w and eng letter...... phone is [3713822].
|
INSP - Framing/Rough-in | 3/19/1998 | 3/19/1998 | 3/19/1998 | P | PASS |
Wes Worcester
|
|
|
03/19/98 342 - Scheduled by Hello!. Contact phone is [3713822].
|
INSP - Framing/Rough-in | 3/18/1998 | 3/18/1998 | 3/18/1998 | P | FAIL |
Wes Worcester
|
|
|
03/18/98 342 - still not braced 2' oc, called phone # [3713822].
|
INSP - Framing/Rough-in | 3/17/1998 | 3/17/1998 | 3/17/1998 | P | FAIL |
Wes Worcester
|
|
|
03/17/98 342 - need engineer's letter on shear nailing that was not done previous visits, truss bracing still not done, electrical panel box in w wall...
|
INSP - Framing/Rough-in | 3/12/1998 | 3/12/1998 | 3/12/1998 | P | PART |
Wes Worcester
|
|
|
engineer to approve his shear schedule as still not done to previous approved plan specs
|
INSP - Framing/Rough-in | 3/11/1998 | 3/11/1998 | 3/11/1998 | P | FAIL |
Wes Worcester
|
|
|
shr being covered and eng fix on walls not done.
|
INSP - Framing/Rough-in | 3/6/1998 | 3/9/1998 | 3/9/1998 | A | FAIL |
Wes Worcester
|
|
|
03/08/98 342 - Scheduled by Hello!. Contact phone is [3713822].
|
INSP - Framing/Rough-in | 3/4/1998 | 3/4/1998 | 3/4/1998 | P | FAIL |
Wes Worcester
|
|
|
03/04/98 342 - full pg, architectual appendage, not to plan, no truss en
|
INSP - Framing/Rough-in | 3/3/1998 | 3/3/1998 | 3/3/1998 | P | NR |
Wes Worcester
|
|
|
03/03/98 342 - PAUL ###-#### FRAMING
|
INSP - Foundation | 10/29/1997 | 10/29/1997 | 10/29/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - poring those areas not effected by correction notice
|
INSP - Foundation | 10/28/1997 | 10/28/1997 | 10/28/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - deleting weld plates....pouring at two pm, need approved pla changes from plan in duplicate w/applicable engineering ie deletion of w and pipe columns
|
INSP - Foundation | 10/28/1997 | 10/28/1997 | 10/28/1997 | P | PART |
Wes Worcester
|
|
|
10/28/97 342 -
|
INSP - Footings | 10/17/1997 | 10/17/1997 | 10/17/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 10/16/1997 | 10/17/1997 | 10/16/1997 | A | CANC |
Wes Worcester
|
|
|
10/16/97 342 - 9 - 9:30 am needs a ftg insp
|
INSP - Footings | 10/16/1997 | 10/16/1997 | 10/16/1997 | P | NR |
Wes Worcester
|
|
|
10/16/97 342 -
|
INSP - Framing/Rough-in | 1/29/1998 | 1/29/1998 | 1/29/1997 | P | PART |
Wes Worcester
|
|
|
paul ###-#### conference on framing
|