INSP - Final | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | PASS |
Carl Dependahl
|
|
|
|
INSP - Letter of compliance | 1/22/1998 | 1/21/1998 | 1/21/1998 | P | PASS |
Carl Dependahl
|
|
|
lc 13080
|
INSP - Framing/Rough-in | 12/8/1997 | 12/8/1997 | 12/8/1997 | | PASS |
|
|
|
Calc's supplied ,ok, #325.
|
INSP - Framing/Rough-in | 12/5/1997 | 12/5/1997 | 12/5/1997 | P | PART |
Carl Dependahl
|
|
|
one hour wall...KEEP C/N, NEED PROPER CALCS FOR BEAM ADDED & COMPLETE 1HR WALL AT INT SIDE.
|
INSP - Energy code compliance | 12/3/1997 | 12/3/1997 | 12/3/1997 | P | NR |
Carl Dependahl
|
|
|
KEEP FRAME C/N....NEED 1HR CONST.
|
INSP - Framing/Rough-in | 12/3/1997 | 12/3/1997 | 12/3/1997 | P | FAIL |
Carl Dependahl
|
|
|
REINSP...KEEP C/N; ADDED BEAM FOR TRUSS BRG, NEED CALCS
|
INSP - Framing/Rough-in | 11/28/1997 | 12/2/1997 | 12/2/1997 | A | FAIL |
Carl Dependahl
|
|
|
C/N: 1HR CONST AT P.L.WALL, TRUSS BEARING AT FRONT WALL & CLIPS/FASTENERS AT BRG. STRAPS, ETC OK TO INS.
|
INSP - Conference | 10/27/1997 | 10/24/1997 | 10/24/1997 | P | PASS |
Carl Dependahl
|
|
|
RE PLAN REQS
|