INSP - Final | 7/13/1998 | 7/14/1998 | 7/14/1998 | A | PASS |
Russ Owen
|
|
|
/ / 407 - bob ###-#### reinspection
|
INSP - Letter of compliance | 7/14/1998 | 7/14/1998 | 7/14/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14731
|
INSP - Letter of compliance | 7/14/1998 | 7/14/1998 | 7/14/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14731
|
INSP - Final | 7/10/1998 | 7/13/1998 | 7/13/1998 | A | FAIL |
Russ Owen
|
|
|
07/13/98 407 - needs before 3 as putting seal on. bob ###-####
|
INSP - Framing/Rough-in | 3/25/1998 | 3/25/1998 | 3/25/1998 | P | PASS |
Russ Owen
|
|
|
Letter from engineer for the on site inspection of the steel column in the garage wing wall he has approved.Letter dated 3/23/98.
|
INSP - Framing/Rough-in | 3/18/1998 | 3/18/1998 | 3/18/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - RE-INSP SOME ITEMS ,BUT HAVE NOT YET RECIEVED ENGINEERS APPP STEEL POST IN GARAGE.
|
INSP - Energy code compliance | 3/12/1998 | 3/13/1998 | 3/13/1998 | A | PASS |
Russ Owen
|
|
|
03/13/98 407 - BOB ###-####
|
INSP - Framing/Rough-in | 3/13/1998 | 3/13/1998 | 3/13/1998 | | FAIL |
Russ Owen
|
|
|
/ / 407 - re-insp.
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/10/1998 | A | FAIL |
Russ Owen
|
|
|
03/10/98 407 - left corrections.
|
INSP - Framing/Rough-in | 3/6/1998 | 3/9/1998 | 3/10/1998 | P | NR |
Russ Owen
|
|
|
03/09/98 407 - no plans on site at PM insp. 03/09/98 301 - trans to russ o. OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Framing/Rough-in | 3/9/1998 | 3/9/1998 | 3/9/1998 | A | NR |
Russ Owen
|
|
|
no approved plans.
|
INSP - Foundation | 11/10/1997 | 11/12/1997 | 11/12/1997 | A | PASS |
Jim Storey
|
|
|
11/12/97 301 - FDN -OK FOUNDATION intior walls
|
INSP - Footings | 11/6/1997 | 11/7/1997 | 11/6/1997 | A | PART |
Russ Owen
|
|
|
11/07/97 407 - no approved plans on site cocrete cont, indicated, the on engineering is the garage fronts. also no rebar was required but has pla 2 con in footing.sat
|