INSP - Final | 12/15/1997 | 12/16/1997 | 12/16/1997 | A | PASS |
Russ Owen
|
|
|
12/16/97 407 - re-insp.
|
INSP - Final | 12/12/1997 | 12/12/1997 | 12/15/1997 | P | PART |
Russ Owen
|
|
|
12/12/97 407 - left correct.
|
INSP - Final | 11/10/1997 | 11/12/1997 | 11/12/1997 | A | CANC |
Jim Storey
|
|
|
11/12/97 301 - cancled by contractor
|
INSP - Framing/Rough-in | 11/12/1997 | 11/10/1997 | 11/10/1997 | | PASS |
Russ Owen
|
|
|
OK TO INSULATE
|
INSP - Final | 11/5/1997 | 11/6/1997 | 11/7/1997 | A | PART |
Russ Owen
|
|
|
11/06/97 407 - this job has 2 contractors. the finish contractor and the concrete has decided to in stall the support under the new windows.
|
INSP - Final | 11/4/1997 | 11/5/1997 | 11/5/1997 | A | CANC |
Tom Arcoraci
|
|
|
will recall on 11-06-97
|
INSP - Carpentry | 10/31/1997 | 10/31/1997 | 10/31/1997 | A | FAIL |
Tom Arcoraci
|
|
|
issued correction notice needs engineering for steel header over basement window wells
|
INSP - Final | 10/30/1997 | 10/31/1997 | 10/31/1997 | A | CANC |
Tom Arcoraci
|
|
|
not final should be carpentry inspection
|
INSP - Footings | 10/20/1997 | 10/20/1997 | 10/20/1997 | P | |
Russ Owen
|
|
|
|
INSP - Framing/Rough-in | 10/15/1997 | 10/16/1997 | 10/16/1997 | P | PASS |
Russ Owen
|
|
|
10/16/97 407 - basement walls
|
INSP - Framing/Rough-in | 10/13/1997 | 10/14/1997 | 10/14/1997 | A | PART |
Russ Owen
|
|
|
10/14/97 407 - BASEMENT partial inspection of left wall, contractor not site,i have seen the same job by this contractor before this work is the same. Left note to have permit and to call me.
|