INSP - Final | 1/5/1999 | 1/6/1999 | 1/6/1999 | P | PASS |
Jim Storey
|
|
|
01/06/99 301 - card with owner final ok
|
INSP-Final Inspection | 1/5/1999 | 1/6/1999 | 1/6/1999 | A | PASS |
Rick Jackson
|
|
|
01/06/99 409 - Sandra Dean ###-#### occ approved
|
INSP-Final Inspection | 10/16/1998 | 10/19/1998 | 10/19/1998 | A | FAIL |
Jim Storey
|
|
|
10/19/98 301 - robert ###-#### no plan on site recall
|
INSP-Sprinkler Rough-in/Hydro | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | PASS |
Rick Jackson
|
|
|
robert- ###-####-sign off sheet at front-spr head insp at copy machine occ approved
|
INSP-Final Inspection | 10/8/1998 | 10/9/1998 | 10/9/1998 | A | PART |
Rick Jackson
|
|
|
sandra ###-#### sprinkler head overspaced by copiers
|
INSP - Conference | 1/5/1998 | 1/6/1998 | 1/6/1998 | A | PASS |
Jim Storey
|
|
|
01/05/98 301 - NWP -GENERAL INSPECTION - NO WORK IN PROGRESS
|
INSP-Sprinkler Rough-in/Hydro | 12/18/1997 | 12/19/1997 | 12/19/1997 | A | PASS |
Rick Jackson
|
|
|
MIGHT BE READY FOR FINAL AS WELL, CONTRACTOR UNSURE okay to cover. gave requirements for final inspection.
|
INSP - Framing/Rough-in | 12/17/1997 | 12/18/1997 | 12/18/1997 | A | PASS |
Jim Storey
|
|
|
12/18/97 301 - CEILING SCLG-OK SUSPENDED CEILING
|
INSP - Framing/Rough-in | 12/2/1997 | 12/3/1997 | 12/3/1997 | A | PART |
Jim Storey
|
|
|
12/03/97 301 - part frame ok ceilling to be insp. at latter time.
|
INSP - Conference | 10/28/1997 | 10/28/1997 | 10/28/1997 | P | PASS |
Jim Storey
|
|
|
10/28/97 301 - SCHEDULED FOR 2:00--BE THERE OR BE SQUARE DUDE
|