INSP - Final | 2/11/1998 | 2/12/1998 | 2/12/1998 | P | PASS |
Russ Owen
|
|
|
02/12/98 407 - ###-#### steve
|
INSP - Letter of compliance | 2/12/1998 | 2/12/1998 | 2/12/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#15555
|
INSP - Letter of compliance | 2/12/1998 | 2/12/1998 | 2/12/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#15555
|
INSP - Framing/Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 | P | PASS |
Russ Owen
|
|
|
01/20/98 407 - this was done 1/16/98.passed.ed.
|
INSP - Framing/Rough-in | 1/16/1998 | 1/16/1998 | 1/16/1998 | | PASS |
Russ Owen
|
|
|
finished holddowns.
|
INSP - Framing/Rough-in | 1/14/1998 | 1/14/1998 | 1/14/1998 | P | PART |
Russ Owen
|
|
|
01/14/98 407 - still has more to complete.
|
INSP - Framing/Rough-in | 1/13/1998 | 1/13/1998 | 1/13/1998 | P | PART |
Russ Owen
|
|
|
01/13/98 407 - called contractor about engineering not yet complete.
|
INSP - Framing/Rough-in | 1/8/1998 | 1/9/1998 | 1/12/1998 | A | PART |
Russ Owen
|
|
|
01/09/98 407 - engineering hold downs. still need to complete.
|
INSP - Energy code compliance | 12/22/1997 | 12/23/1997 | 12/23/1997 | P | PART |
Russ Owen
|
|
|
12/23/97 407 - left corrections,ok to sheetrock,need to complete the eng
|
INSP - Energy code compliance | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | CANC |
Russ Owen
|
|
|
12/22/97 407 - cancelled by contractor.12/22/97 at 10:00:38.
|
INSP - Framing/Rough-in | 12/19/1997 | 12/19/1997 | 12/19/1997 | | FAIL |
Russ Owen
|
|
|
/ / 407 - left corrections.
|
INSP - Framing/Rough-in | 12/18/1997 | 12/18/1997 | 12/18/1997 | P | FAIL |
Russ Owen
|
|
|
Scheduled by Hello! on 12/18/97 at 10:09:58.
|