INSP - Final | 6/15/1998 | 6/16/1998 | 6/16/1998 | A | PASS |
Jim Storey
|
|
|
06/16/98 301 - FNL -OK FINAL
|
INSP-Final Inspection | 6/1/1998 | 6/2/1998 | 6/2/1998 | A | PASS |
Rick Jackson
|
|
|
Joe ###-#### cell ###-#### occ approved
|
INSP - Final | 4/15/1998 | 4/16/1998 | 4/16/1998 | P | CANC |
Jim Storey
|
|
|
04/16/98 301 - cancled via phone call from office by dixie
|
INSP-Final Inspection | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | NR |
Rick Jackson
|
|
|
joe dalsoglio ###-#### strobe not changed out in office area
|
INSP - Framing/Rough-in | 4/9/1998 | 4/9/1998 | 4/9/1998 | A | FAIL |
Jim Storey
|
|
|
04/09/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NOT APPROVED F
|
INSP-Final Inspection | 4/9/1998 | 4/9/1998 | 4/9/1998 | P | FAIL |
Rick Jackson
|
|
|
mic #2-1sr and 2nd floor exit signs needed, drop sprinkler heads, penetration in corridor - corridor area only checked
|
INSP - Framing/Rough-in | 2/18/1998 | 2/19/1998 | 2/19/1998 | A | PASS |
Jim Storey
|
|
|
02/18/98 301 - JOE ###-####--BLDG #2--PAGER 96313 framing in progess coridor 2 nd floor ok
|
INSP-Sprinkler Rough-in/Hydro | 2/18/1998 | 2/19/1998 | 2/19/1998 | A | CANC |
Joe Tawney
|
|
|
02/19/98 406 - JOE ###-#### OR PAGER 96313--BLDG 2 CANCELLED RESCHED FOR MONDAY 2/23/98
|
INSP - Framing/Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 | P | PART |
Jim Storey
|
|
|
02/11/98 301 - bld 1 1st floor Joe ###-#### WIP -WORK IN PROGRESS special insp. on site.pending reports
|
INSP - Framing/Rough-in | 1/6/1998 | 1/8/1998 | 1/8/1998 | A | PASS |
Jim Storey
|
|
|
01/08/98 301 - FRAM-OK FRAMING south half of project. fire stopping at corridor ok for celling.
|
INSP-Final Inspection | 1/6/1998 | 1/8/1998 | 1/8/1998 | A | PART |
Rick Jackson
|
|
|
TA1 partial completion of area covered under permit
|