INSP - Final | 8/3/1998 | 8/4/1998 | 8/4/1998 | A | PASS |
Jim Storey
|
|
|
08/04/98 301 - joe ###-#### FNL -OK FINAL
|
INSP - Framing/Rough-in | 6/22/1998 | 6/23/1998 | 6/24/1998 | A | PASS |
Jim Storey
|
|
|
06/24/98 301 - Joe ###-####
|
INSP - Final | 6/15/1998 | 6/16/1998 | 6/16/1998 | A | NR |
Jim Storey
|
|
|
06/16/98 301 - NR
|
INSP-Final Inspection | 6/2/1998 | 6/2/1998 | 6/2/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP - Framing/Rough-in | 5/26/1998 | 5/26/1998 | 5/26/1998 | P | PASS |
Jim Storey
|
|
|
05/26/98 301 - SCLG-OK SUSPENDED CEILING all membrane penatrations ok ab
|
INSP-Final Inspection | 5/26/1998 | 5/26/1998 | 5/26/1998 | P | CANC |
Rick Jackson
|
|
|
before 3:00-joe 3681086-mic #1 joe wasn't available after 3:00
|
INSP - Framing/Rough-in | 4/30/1998 | 5/4/1998 | 5/4/1998 | A | PASS |
Jim Storey
|
|
|
05/04/98 301 - FRAM-OK FRAMING
|
INSP-Sprinkler Rough-in/Hydro | 4/30/1998 | 5/1/1998 | 5/1/1998 | A | PART |
Rick Jackson
|
|
|
joe/ ###-#### rough-in sprinkler drops not in. increase strobes to 110's shown on plans.
|
INSP - Framing/Rough-in | 4/10/1998 | 4/10/1998 | 4/10/1998 | P | CANC |
Russ Owen
|
|
|
done by 301.
|
INSP - Framing/Rough-in | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | FAIL |
Jim Storey
|
|
|
04/09/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Sprinkler Rough-in/Hydro | 4/9/1998 | 4/9/1998 | 4/9/1998 | P | FAIL |
Rick Jackson
|
|
|
joe ###-#### 110 cd strobe in office area
|
INSP - Framing/Rough-in | 3/5/1998 | 3/5/1998 | 3/5/1998 | P | PASS |
Jim Storey
|
|
|
03/05/98 301 - joe ###-#### or 96313 GWB -OK SHEETROCK NAILING 2HR AND 1 HR.
|
INSP - Framing/Rough-in | 2/24/1998 | 2/24/1998 | 2/25/1998 | P | PASS |
Jim Storey
|
|
|
02/24/98 301 - BLDG 1--JOE PAGER 96313 OR CELL IS ###-####
|
INSP - Framing/Rough-in | 2/18/1998 | 2/19/1998 | 2/19/1998 | A | PART |
Jim Storey
|
|
|
02/18/98 301 - JOE ###-####--BLDG 1
|
INSP - Framing/Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 | P | PART |
Jim Storey
|
|
|
02/11/98 301 - bld#1 fab 1 joe ###-#### WIP -WORK IN PROGRESS reinsp required
|
INSP - Footings | 1/6/1998 | 1/8/1998 | 1/8/1998 | A | PART |
Jim Storey
|
|
|
01/08/98 301 - special insp on site pending report and scope of s.i. to
|