INSP - Final | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | PASS |
Russ Owen
|
|
|
04/09/98 407 - Scheduled by Hello!. Contact phone is [4241366].
|
INSP - Letter of compliance | 4/9/1998 | 4/9/1998 | 4/9/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#15521
|
INSP - Letter of compliance | 4/9/1998 | 4/9/1998 | 4/9/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#15521
|
INSP - Final | 4/8/1998 | 4/8/1998 | 4/8/1998 | | FAIL |
Russ Owen
|
|
|
04/08/98 407 - left corrections.
|
INSP - Final | 4/8/1998 | 4/8/1998 | 4/8/1998 | P | FAIL |
Russ Owen
|
|
|
left corrects.
|
INSP - Framing/Rough-in | 2/23/1998 | 2/23/1998 | 2/23/1998 | P | PASS |
Russ Owen
|
|
|
framer has asked me to make sure his correction have been approved, he and i have went over them and i have approved.
|
INSP - Framing/Rough-in | 2/19/1998 | 2/20/1998 | 2/20/1998 | P | PASS |
Jim Storey
|
|
|
02/20/98 301 - ###-#### joe INSL-OK INSULATION-ENERGY CODE framing passed prviously.
|
INSP - Framing/Rough-in | 2/20/1998 | 2/19/1998 | 2/19/1998 | A | FAIL |
Russ Owen
|
|
|
left corects.
|
INSP - Framing/Rough-in | 2/17/1998 | 2/18/1998 | 2/19/1998 | P | FAIL |
Russ Owen
|
|
|
02/18/98 407 - ###-#### RICK ì
|
INSP - Framing/Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 | P | NR |
Russ Owen
|
|
|
need electrical approval.
|
INSP - Footings | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | PART |
Russ Owen
|
|
|
no plans on site, set backs appear to be correct,told person on site to have the general contractor call me .
|