INSP - Final | 1/19/1999 | 1/20/1999 | 1/20/1999 | A | PASS |
|
|
|
MOXIE JAVA...JAMES..###-#### made ok to sign for perm occ.
|
Permanent Occupancy | | 1/20/1999 | 1/20/1999 | | DONE |
|
|
|
|
INSP - Final | 6/5/1998 | 6/5/1998 | 6/5/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 12/29/1997 | 12/30/1997 | 12/30/1997 | P | PART |
|
|
|
12/30/97 338 - MOXIE JAVA made ok with c/n verbal must seizmic for suspe
|
INSP - Final | 12/30/1997 | 12/30/1997 | 12/30/1997 | P | PART |
|
|
|
12/30/97 338 - signed the card in the temp col.
|
INSP - Final | 12/30/1997 | 12/30/1997 | 12/30/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR TEMP OCC AND ASSEMBLY PERMIT
|
INSP-Final Inspection | 12/30/1997 | 12/30/1997 | 12/30/1997 | P | PART |
|
|
|
12/30/97 338 - fire life and stuff joes c/n completed could not reach jo signed for him in the temp col. life safety and sprinklers.
|
INSP - Final | 12/24/1997 | 12/29/1997 | 12/29/1997 | A | NR |
|
|
|
12/28/97 338 -
|
INSP - Final | 12/23/1997 | 12/24/1997 | 12/24/1997 | P | NR |
|
|
|
12/24/97 338 - MOXIE JAVA temp will be ok when shell building has at lea
|
INSP - Framing/Rough-in | 12/5/1997 | 12/8/1997 | 12/8/1997 | A | PASS |
|
|
|
12/08/97 338 - ok to cover behind the ele inspection for misc interior w made ok
|
INSP - Conference | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PASS |
|
|
|
11/26/97 338 - JEFF'S CELL ###-####/ MOXIE'S made ok with the ext walls with the ele insp approval
|
INSP - Conference | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PASS |
Joe Tawney
|
|
|
11/26/97 406 - JEFF'S CELL ####-####/ MOXIE'S PRE FINAL CONF ON TI
|