Permanent Occupancy | | 2/24/1998 | 2/24/1998 | | DONE |
|
|
|
|
INSP - Final | 2/23/1998 | 2/23/1998 | 2/23/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 2/23/1998 | 2/23/1998 | 2/23/1998 | P | PASS |
|
|
|
02/23/98 338 - AFTER 5:00 P.M.jc ###-#### tenant improvement blue heron
|
INSP-Final Inspection | 2/18/1998 | 2/19/1998 | 2/19/1998 | A | FAIL |
Joe Tawney
|
|
|
02/19/98 406 - JC ###-#### REINSP FOR FINAL FAIL DET OVERSPACING INT SPKLR ALARM ALARM PANEL REPAIR
|
INSP-Sprinkler Rough-in/Hydro | 2/12/1998 | 2/13/1998 | 2/13/1998 | A | FAIL |
Joe Tawney
|
|
|
02/13/98 406 - 11:00 a.m. j.c. ###-#### Fire Life Safety/Sprinkler roug FINAL FAIL ADD 1 STROBE SMOKE DET OVERSPACED IN SEVERAL AREAS
|
INSP - Framing/Rough-in | 1/27/1998 | 1/29/1998 | 1/29/1998 | A | PART |
|
|
|
01/29/98 338 - made ok to drop in tiles corr fire caulk still req
|
INSP - Framing/Rough-in | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | PASS |
|
|
|
01/16/98 338 - ceiling grid partial ###-#### J.C.
|
INSP - Framing/Rough-in | 12/17/1997 | 12/17/1997 | 12/18/1997 | P | PASS |
|
|
|
12/17/97 338 - AGRICULTURE DEPT verbal correction made ok fire pads to b receps within 24" horiz.
|
INSP - Framing/Rough-in | 12/11/1997 | 12/12/1997 | 12/12/1997 | A | PASS |
|
|
|
12/12/97 338 - BLUE HERON #4 madeok when the fire caulking is complete
|
INSP - Framing/Rough-in | 12/8/1997 | 12/8/1997 | 12/8/1997 | P | PART |
|
|
|
12/08/97 338 - correction issued need proper details and listing for the etc
|