Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD97-03187
StatusFinaled
Name BERENDSEN FLUID
Site Address 8783 W HACKAMORE DR Unit: 9
Project NameLB INDUSTRIES
Customer Number 
ePlanReviewNo
Description
To finish a 1,250 sq.ft. sales/office tenant space per approved plans on file. Work to include construction of approximatly 50lf of one-hour tenant demising wall and interior partition wall to create a sales area, a conference room, a community room, a hallway, a restroom, and a storage room all with a new suspended ceiling system, flooring, and finish as shown on the approved plans. NOTE: This building is fully fire sprinklered for area increase and alterations shall be per NFPA #13 as administered by the Fire Department. A NEW CERTIFICATE OF OCCUPANCY MUST BE OBTAINED BY THE OCCUPANT PRIOR TO OCCUPYING THIS SPACE. (P.C.#682-97) PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/7/199812/7/1998 DONE
Details
INSP - Final9/18/19989/18/19989/18/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC
INSP - Final1/22/19981/23/19981/23/1998APART
Details
01/23/98 338 - made ok for temp occ only c/n in force
INSP - Final1/21/19981/22/19981/22/1998PCANC
Details
01/22/98 338 - uNIT 9-###-####, LARRY to be for 406 fire
INSP - Framing/Rough-in1/21/19981/22/19981/22/1998AFAIL
Details
01/22/98 338 - GRID CEILING UNIT 9 ###-#### c/n issued seizmic correctio thumb turn from the exit door. ok to drop in the tiles.
INSP - Set-back1/22/19981/22/19981/22/1998 PASS
Details
/ / 338 - fire final requested not str with inspection clerks
INSP-Final Inspection1/22/19981/22/19981/22/1998PPART
DetailsJoe Tawney
01/22/98 406 - PER PPAINE OK FOR TEMP OCC
INSP-Sprinkler Rough-in/Hydro1/20/19981/20/19981/20/1998 PART
DetailsJoe Tawney
/ / 406 - OK TO COVER OK ON ROUGH IN
INSP - Framing/Rough-in12/23/199712/24/199712/24/1997PPASS
DetailsJim Storey
12/24/97 301 - FRAM-OK FRAMING
INSP - Conference12/23/199712/23/199712/23/1997 PASS
Details
/ / 338 - SENT TO 301
INSP - Framing/Rough-in12/22/199712/22/199712/23/1997PNR
DetailsTom Arcoraci
12/22/97 408 -