Permanent Occupancy | | 6/4/1999 | 6/4/1999 | | DONE |
|
|
|
|
INSP - Final | 1/30/1998 | 2/2/1998 | 2/2/1998 | P | PASS |
|
|
|
02/02/98 338 - ###-#### signed the perm col occ req card
|
INSP - Final | 2/2/1998 | 2/2/1998 | 2/2/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR PERM OCC
|
INSP-Final Inspection | 1/30/1998 | 2/2/1998 | 2/2/1998 | A | NH |
Joe Tawney
|
|
|
02/02/98 406 - ###-#### FINAL NO ONE ON SITE DOOR LOCKED
|
INSP - Framing/Rough-in | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | PASS |
Wes Worcester
|
|
|
01/23/98 342 - CEILING GRID--PROBLEM RAY ###-####
|
INSP - Wall cover | 1/8/1998 | 1/8/1998 | 1/8/1998 | P | PASS |
|
|
|
01/08/98 338 - FIRE CAULKING made ok in the front areas at the roof deck
|
INSP - Framing/Rough-in | 12/20/1997 | 12/19/1997 | 12/19/1997 | | PASS |
|
|
|
12/19/97 338 - made eok to cover 1-side
|
INSP - Framing/Rough-in | 12/20/1997 | 12/19/1997 | 12/19/1997 | | PASS |
|
|
|
12/19/97 338 - made eok to cover 1-side
|