Permanent Occupancy | | 10/23/1998 | 10/23/1998 | | DONE |
|
|
|
|
INSP - Final | 10/16/1998 | 10/19/1998 | 10/19/1998 | A | PART |
Jim Storey
|
|
|
10/19/98 301 - DOUG-###-#### FOR FN INSP FNL -OK FINAL pending other sign offs
|
INSP-Final Inspection | 10/15/1998 | 10/16/1998 | 10/16/1998 | P | PASS |
Rick Jackson
|
|
|
doug ###-#### occ approved
|
INSP-Final Inspection | 10/15/1998 | 10/15/1998 | 10/15/1998 | A | FAIL |
Rick Jackson
|
|
|
sway bracing, ground wire, signs for sprinkler valves, need to test interlocks
|
INSP-Sprinkler Rough-in/Hydro | 8/24/1998 | 8/24/1998 | 8/24/1998 | P | PASS |
Rick Jackson
|
|
|
hydro of paint booth. still waiting for info on the sway bracing problem
|
INSP - Framing/Rough-in | 5/27/1998 | 5/27/1998 | 5/27/1998 | P | PART |
Russ Owen
|
|
|
Resubmital wanting to remove a vestibule,this is ok with me i have also talked with Martin S, of P&Z this will be acceptable,will require the architect to submit a full scale plan detail for the files,waiting for this.
|
INSP - Foundation | 5/14/1998 | 5/15/1998 | 5/18/1998 | A | PASS |
Russ Owen
|
|
|
05/15/98 407 - ok.
|
INSP - Foundation | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | PART |
Russ Owen
|
|
|
05/12/98 407 - OK TO GROUT SECTIONS READY.NSP.
|
INSP - Foundation | 5/7/1998 | 5/8/1998 | 5/8/1998 | P | PART |
Russ Owen
|
|
|
05/08/98 407 - called contractor about left rear section needs the verti said ssr###-#### rebar
|
INSP - Foundation | 5/6/1998 | 5/6/1998 | 5/6/1998 | P | PART |
Russ Owen
|
|
|
I HAD TO CALL CONTRACTOR TO FIND OUT THE REBAR REQUIREMENTS,AS NO ONE AT THE SITE,HE TOLD ME WHAT WAS REQUIRED AND IT WOULD APPEAR THAT IT HAS BEEN DONE PER THE PLANS,ITS A SMALL PORTION OF BUILDING FOR PAINT.
|
INSP - Concrete | 4/2/1998 | 4/3/1998 | 4/3/1998 | A | PART |
Russ Owen
|
|
|
04/03/98 407 - footings and walls poured before any city inspection, con MTI special inspector was at site before all pours. .
|