Permit Information
Permit NumberBLD97-03293
StatusFinaled
Name WESTERN TRAILERS
Site Address 6701 BUSINESS WAY
Project NameWESTERN TRAILERS
Customer Number 
ePlanReviewNo
Description
(WESTERN TRAILERS)(NEW PAINT FACILITY) TO CONSTRUCT A NEW PAINT BUILDING (5,280 SQ. FT.) INCLUDING SITE IMPROVEMENTS. CONSTRUCTION TO BE ALL NONCOMBUSTIBLE MATERIALS, CONCRETE FOUNDATION AND FLOOR, CONCRETE BLOCK, STRUCTURAL STEEL BEAMS, COLUMNS AND GIRDERS. THIS BUILDING IS FULLY FIRE SPRINKLERED. ALL PER APPROVED PLANS. DR#63-96 PC#552-97 HAZARDOUS MATERAILS STORED AND USED WITHIN THIS BUILDING ARE NOT PERMITTED TO EXCEED THE ALLOWABLE AMOUNTS OF UBC TABLES 3-D AND 3-E AS APPROVED.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 10/23/199810/23/1998 DONE
Details
INSP - Final10/16/199810/19/199810/19/1998APART
DetailsJim Storey
10/19/98 301 - DOUG-###-#### FOR FN INSP FNL -OK FINAL pending other sign offs
INSP-Final Inspection10/15/199810/16/199810/16/1998PPASS
DetailsRick Jackson
doug ###-#### occ approved
INSP-Final Inspection10/15/199810/15/199810/15/1998AFAIL
DetailsRick Jackson
sway bracing, ground wire, signs for sprinkler valves, need to test interlocks
INSP-Sprinkler Rough-in/Hydro8/24/19988/24/19988/24/1998PPASS
DetailsRick Jackson
hydro of paint booth. still waiting for info on the sway bracing problem
INSP - Framing/Rough-in5/27/19985/27/19985/27/1998PPART
DetailsRuss Owen
Resubmital wanting to remove a vestibule,this is ok with me i have also talked with Martin S, of P&Z this will be acceptable,will require the architect to submit a full scale plan detail for the files,waiting for this.
INSP - Foundation5/14/19985/15/19985/18/1998APASS
DetailsRuss Owen
05/15/98 407 - ok.
INSP - Foundation5/11/19985/12/19985/12/1998APART
DetailsRuss Owen
05/12/98 407 - OK TO GROUT SECTIONS READY.NSP.
INSP - Foundation5/7/19985/8/19985/8/1998PPART
DetailsRuss Owen
05/08/98 407 - called contractor about left rear section needs the verti said ssr###-#### rebar
INSP - Foundation5/6/19985/6/19985/6/1998PPART
DetailsRuss Owen
I HAD TO CALL CONTRACTOR TO FIND OUT THE REBAR REQUIREMENTS,AS NO ONE AT THE SITE,HE TOLD ME WHAT WAS REQUIRED AND IT WOULD APPEAR THAT IT HAS BEEN DONE PER THE PLANS,ITS A SMALL PORTION OF BUILDING FOR PAINT.
INSP - Concrete4/2/19984/3/19984/3/1998APART
DetailsRuss Owen
04/03/98 407 - footings and walls poured before any city inspection, con MTI special inspector was at site before all pours. .