INSP - Final | 5/8/1998 | 5/11/1998 | 5/11/1998 | A | PASS |
Tom Arcoraci
|
|
|
05/11/98 408 - DON/###-#### - LATE AM RE-INSP. ON FINAL.
|
INSP - Final | 5/8/1998 | 5/8/1998 | 5/8/1998 | P | |
Jim Sly
|
|
|
DON/###-#### - FINAL.
|
INSP - Final | 5/8/1998 | 5/8/1998 | 5/8/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N....Need elect final....
|
INSP - Energy code compliance | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | CANC |
Jim Sly
|
|
|
03/30/98 316 - Done by Tom A.
|
INSP - Energy code compliance | 3/31/1998 | 3/31/1998 | 3/31/1998 | A | PASS |
Tom Arcoraci
|
|
|
|
INSP - Framing/Rough-in | 3/27/1998 | 3/27/1998 | 3/27/1998 | P | PASS |
Tom Arcoraci
|
|
|
reinspection don ###-####
|
INSP - Framing/Rough-in | 3/24/1998 | 3/25/1998 | 3/25/1998 | P | FAIL |
Jim Sly
|
|
|
03/25/98 316 - reinspection C/N...Still need to complete engineering for
|
INSP - Framing/Rough-in | 3/23/1998 | 3/24/1998 | 3/24/1998 | P | CANC |
Jim Sly
|
|
|
REINSPECTION DON ###-#### cancelled by don rescheduled for pm wednesday
|
INSP - Framing/Rough-in | 3/13/1998 | 3/13/1998 | 3/13/1998 | P | FAIL |
Tom Arcoraci
|
|
|
03/13/98 408 - DON ###-#### eng req for front bay for wall bracing req
|
INSP - Footings | 1/21/1998 | 1/22/1998 | 1/22/1998 | A | PASS |
Jim Sly
|
|
|
01/21/98 316 - OK
|