INSP - Final | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PASS |
|
|
|
09/17/98 338 - signed the perm col
|
Permanent Occupancy | | 9/18/1998 | 9/18/1998 | | DONE |
|
|
|
|
INSP - Final | 7/13/1998 | 7/14/1998 | 7/14/1998 | A | PART |
|
|
|
07/13/98 338 - signed the temp col
|
INSP-Final Inspection | 7/13/1998 | 7/14/1998 | 7/14/1998 | A | PASS |
Joe Tawney
|
|
|
07/14/98 406 - sue ###-#### REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 7/10/1998 | 7/13/1998 | 7/13/1998 | A | FAIL |
Joe Tawney
|
|
|
07/13/98 406 - ###-#### REINSP FAIL APT NMBRS
|
INSP-Final Inspection | 7/8/1998 | 7/9/1998 | 7/9/1998 | P | FAIL |
Joe Tawney
|
|
|
07/09/98 406 - ###-#### FINAL FAIL ADDRESS AND ROOM NMBRS PAINT & LETTER CURBS
|
INSP - Final | 7/7/1998 | 7/8/1998 | 7/8/1998 | A | NR |
|
|
|
07/08/98 338 - OTH-OTHER AGENCIES NOT APPROVED CONF ON THE FINAL SIGNOFF
|
INSP - Conference | 6/29/1998 | 6/29/1998 | 6/29/1998 | | PART |
|
|
|
/ / 338 - WITH THE GENERAL ABOUT FINAL INSP REQUIREMENTS 45 MIN
|
INSP - Framing/Rough-in | 4/30/1998 | 5/1/1998 | 5/1/1998 | P | PASS |
|
|
|
made ok to cover c/n removed
|
INSP - Framing/Rough-in | 4/28/1998 | 4/30/1998 | 4/30/1998 | A | PART |
|
|
|
MADE OK TO START HANGING THE LOWER CEILINGS ONLY
|
INSP - Framing/Rough-in | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PART |
|
|
|
04/30/98 338 - partial ok to cover to recall
|
INSP - Framing/Rough-in | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PART |
|
|
|
04/30/98 338 - partial ok to cover to recall
|
INSP - Framing/Rough-in | 4/24/1998 | 4/27/1998 | 4/27/1998 | P | FAIL |
|
|
|
04/27/98 338 - OK TO INSU. ONLY C/N ISSUED
|
INSP - Foundation | 3/17/1998 | 3/17/1998 | 3/17/1998 | P | CANC |
|
|
|
03/17/98 338 - cancelled by lee problem settlee with a phone conf.tony 3
|
INSP - Wall cover | 2/2/1998 | 2/2/1998 | 2/2/1998 | P | PART |
Jim Storey
|
|
|
02/02/98 301 - tony ###-#### pwoi ì
|
INSP - Footings | 1/29/1998 | 1/29/1998 | 1/29/1998 | P | NR |
|
|
|
01/29/98 338 - READY AT 3:30---TONY AT ###-#### not ready want to pour 2 tomorrow
|