INSP - Footings | 5/22/1998 | 5/22/1998 | 5/22/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - Foot width, height, soil and minimum setback req. OK
|
INSP - Final | 5/14/1998 | 5/15/1998 | 5/15/1998 | A | PASS |
Tom Arcoraci
|
|
|
05/15/98 408 - LARRY ###-#### RE INSP ON FN ACCESS UNDER HS NUMBERS
|
INSP - Final | 5/13/1998 | 5/13/1998 | 5/13/1998 | P | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N....Need temp glass bath, load hinges gar door...
|
INSP - Final | 3/26/1998 | 3/27/1998 | 3/27/1998 | P | FAIL |
Jim Sly
|
|
|
03/27/98 316 - C/N....Need temp glass bath, Mech and Plumb finals...
|
INSP - Energy code compliance | 1/14/1998 | 1/14/1998 | 1/14/1998 | P | PASS |
Tom Arcoraci
|
|
|
BRIAN ###-####
|
INSP - Framing/Rough-in | 1/14/1998 | 1/14/1998 | 1/14/1998 | P | FAIL |
Tom Arcoraci
|
|
|
PLANS BETWEEN SHEETROCK INSIDE FRONT DOOR. PROBLEM CALL BRIAN AT ###-####
|
INSP - Energy code compliance | 1/9/1998 | 1/12/1998 | 1/12/1998 | P | CANC |
Jim Sly
|
|
|
01/12/98 316 - Gave to Tom A.
|
INSP - Energy code compliance | 1/12/1998 | 1/12/1998 | 1/12/1998 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Framing/Rough-in | 1/12/1998 | 1/12/1998 | 1/12/1998 | | FAIL |
Tom Arcoraci
|
|
|
/ / 408 - no approved plans 2nd request
|
INSP - Framing/Rough-in | 1/9/1998 | 1/12/1998 | 1/12/1998 | P | CANC |
Jim Sly
|
|
|
01/12/98 316 - Gave to Tom A.
|
INSP - Framing/Rough-in | 1/9/1998 | 1/9/1998 | 1/9/1998 | P | FAIL |
Jim Sly
|
|
|
01/09/98 316 - C/N...Truss nailing...shear nailing...
|