INSP - Final | 1/27/1999 | 1/27/1999 | 1/28/1999 | P | PASS |
|
|
|
made ok for signoff withother agencies approval
|
Permanent Occupancy | | 1/27/1999 | 1/27/1999 | | DONE |
|
|
|
|
INSP - Final | 9/24/1998 | 9/24/1998 | 9/24/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Conference | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF LEFT COPY OF C/N WITH REMAINING ITEMS FOR PERM OCC
|
INSP - Conference | 3/24/1998 | 3/24/1998 | 3/24/1998 | | PASS |
|
|
|
/ / 338 - with ctr on time cdhd will be on site.
|
INSP - Final | 3/23/1998 | 3/24/1998 | 3/24/1998 | A | PART |
|
|
|
03/24/98 338 - signed the temp col of the occ req. card
|
INSP - Final | 3/19/1998 | 3/20/1998 | 3/20/1998 | P | NR |
|
|
|
03/20/98 338 - OTH-OTHER AGENCIES NOT APPROVED NEED CHHD. AFTER 6:00
|
INSP-Final Inspection | 3/20/1998 | 3/20/1998 | 3/20/1998 | P | PART |
Joe Tawney
|
|
|
03/20/98 406 - 338 is going out also-this inspection was requested by 33 FINAL OK FOR TEMP OCC OCC LOAD SIGN ALARM TEST SHELL SIGN OFF
|
INSP - Framing/Rough-in | 3/13/1998 | 3/13/1998 | 3/13/1998 | P | PASS |
|
|
|
03/13/98 338 - made ok kent ###-####-fire wall around a duct
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/10/1998 | A | FAIL |
|
|
|
03/10/98 338 - no assy reviewed for use and no insp done on the framing
|
INSP - Framing/Rough-in | 1/21/1998 | 1/22/1998 | 1/22/1998 | A | PASS |
|
|
|
01/22/98 338 - LARRY ###-#### made ok FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 1/16/1998 | 1/20/1998 | 1/20/1998 | A | NR |
|
|
|
01/20/98 338 - not ready for frame insp OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Foundation | 1/8/1998 | 1/9/1998 | 1/9/1998 | A | PASS |
|
|
|
01/08/98 338 - yen ching/ pouring slab with wire meshing in it. hope to made ok
|