INSP - Final | 12/1/1998 | 12/1/1998 | 12/1/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 4/20/1998 | 4/20/1998 | 4/20/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL PHASE 1 FAIL ALARM SYSTEM
|
INSP - Final | 3/30/1998 | 3/31/1998 | 3/31/1998 | P | CANC |
|
|
|
doubled up inspNAL INSP
|
INSP - Final | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | NR |
|
|
|
ok to start moving in called joe at ref # will recall for next week when fire corrections are taken care of
|
INSP-Final Inspection | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | PART |
Joe Tawney
|
|
|
03/31/98 406 - JOE ###-#### FINAL INSP REINSP OK FOR TEMP OCC PHASE I OSHA EMERG LIGHTS HORN/STROBES
|
INSP-Final Inspection | 3/27/1998 | 3/30/1998 | 3/30/1998 | P | NR |
Joe Tawney
|
|
|
03/30/98 406 - joe ###-#### reinspection REINSP NOT READY
|
INSP - Final | 3/27/1998 | 3/27/1998 | 3/27/1998 | | PASS |
|
|
|
/ / 338 - JOE AT ###-####
|
INSP - Final | 3/27/1998 | 3/27/1998 | 3/27/1998 | | PASS |
|
|
|
/ / 338 - JOE AT ###-####
|
INSP-Final Inspection | 3/27/1998 | 3/27/1998 | 3/27/1998 | P | FAIL |
Joe Tawney
|
|
|
03/27/98 406 - joe ###-#### reinspection FINAL FAIL ALARM SYSTEM UPGRADE EMERG LIGHTS DOOR SWING
|
INSP - Final | 3/24/1998 | 3/26/1998 | 3/26/1998 | A | NR |
|
|
|
03/26/98 338 - RESCHEDULED TO 03-27-98 ###-#### joe
|
INSP-Final Inspection | 3/24/1998 | 3/25/1998 | 3/25/1998 | A | FAIL |
Joe Tawney
|
|
|
03/25/98 406 - ###-#### joe SPKLR INSP FAIL ONE HEAD OVERSPACED NEAR OFFICE #16
|
INSP - Framing/Rough-in | 3/4/1998 | 3/4/1998 | 3/5/1998 | P | PASS |
|
|
|
03/05/98 338 - ok to moove door placement to keep integrity of corridor
|
INSP - Framing/Rough-in | 2/24/1998 | 2/24/1998 | 2/24/1998 | P | PART |
Tom Arcoraci
|
|
|
02/24/98 408 - joe mobile ###-#### tenant improvement ok to cover after elec rough left correction notice asking what they are to do with hole in rated corridor
|