INSP - Final | 5/5/1998 | 5/5/1998 | 5/5/1998 | P | CANC |
Tom Arcoraci
|
|
|
05/05/98 408 - Scheduled by Hello!. Contact phone is [8618668].
|
INSP - Final | 4/14/1998 | 4/14/1998 | 4/14/1998 | P | PASS |
Tom Arcoraci
|
|
|
04/14/98 408 - ###-####
|
INSP - Energy code compliance | 1/29/1998 | 1/29/1998 | 1/29/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 1/28/1998 | 1/29/1998 | 1/29/1998 | P | PASS |
Jim Sly
|
|
|
01/29/98 316 - ###-#### GARY ì
|
INSP - Framing/Rough-in | 1/26/1998 | 1/27/1998 | 1/27/1998 | A | NR |
Jim Sly
|
|
|
01/26/98 316 - Cancelled by contractor...
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | FAIL |
Jim Sly
|
|
|
01/20/98 316 - C/N....Need engineering....
|
INSP - Footings | 1/20/1998 | 1/20/1998 | 1/20/1998 | P | CANC |
Tom Arcoraci
|
|
|
REIN ###-#### GARY done by 316 on 12-17-97 poured with out inspection
|
INSP - Footings | 12/16/1997 | 12/17/1997 | 12/17/1997 | A | PASS |
Jim Sly
|
|
|
poured without inspection appears ok/set-back apprears ok 12/16/97 316 - Poured W/O inspection....
|