Permanent Occupancy | | 11/13/1998 | 11/13/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 4/2/1998 | 4/2/1998 | 4/2/1998 | | PASS |
|
|
|
REINSP OK FOR PERM OCC
|
INSP - Final | 3/11/1998 | 3/12/1998 | 3/12/1998 | A | PASS |
|
|
|
03/12/98 338 - signed the temp col
|
INSP - Framing/Rough-in | 3/11/1998 | 3/12/1998 | 3/12/1998 | A | PASS |
|
|
|
03/12/98 338 - conference made ok
|
INSP-Final Inspection | 3/10/1998 | 3/11/1998 | 3/11/1998 | P | PASS |
Joe Tawney
|
|
|
03/11/98 406 - mike ###-#### FINAL OK FOR TEMP OCC DOOR HDWRE FIRE EXT FDC LOCATION ì
|
INSP - Framing/Rough-in | 2/10/1998 | 2/10/1998 | 2/10/1998 | P | PASS |
|
|
|
02/10/98 338 - mike ###-#### rough in FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 1/26/1998 | 1/27/1998 | 1/27/1998 | A | PART |
|
|
|
01/27/98 338 - ###-#### PLACEMENT OF THE DRAINAGE FOR ROOF IS IN THE PR ELEC. SWITCH GEAR. ELE SAID THAT THIS WAS TO BE REMOVED WITH PENDING ADDITION
|
INSP - Conference | 1/20/1998 | 1/20/1998 | 1/20/1998 | | PASS |
|
|
|
/ / 338 - conf to speak of future permits and plan submittals this pro will meet with all 01-21-98 9;am
|
INSP - Framing/Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 | P | PASS |
|
|
|
01/20/98 338 - made ok
|