INSP - Final | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Russ Owen
|
|
|
05/05/98 407 - Scheduled by Hello!. Contact phone is [8666175].
|
INSP - Framing/Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | | CANC |
Russ Owen
|
|
|
05/05/98 407 - Scheduled by Hello!. Contact phone is [8666175].
|
INSP - Letter of compliance | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - lc#14347.
|
INSP - Letter of compliance | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - lc#14347.
|
INSP - Final | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | FAIL |
Russ Owen
|
|
|
04/28/98 407 - need temp windows over tub.ct phone is [8666175].
|
INSP - Energy code compliance | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | PASS |
Russ Owen
|
|
|
02/27/98 407 - BOB ###-####
|
INSP - Framing/Rough-in | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | PASS |
Russ Owen
|
|
|
02/27/98 407 - BOB ###-####
|
INSP - Framing/Rough-in | 2/24/1998 | 2/25/1998 | 2/25/1998 | A | FAIL |
Russ Owen
|
|
|
02/25/98 407 - left corrections
|
INSP - Wall cover | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | PART |
Carl Dependahl
|
|
|
reinspect on sheer wall bob ###-#### NEED 2 STRAPS AT 2ND FL
|
INSP - Framing/Rough-in | 2/12/1998 | 2/13/1998 | 2/13/1998 | A | PART |
Russ Owen
|
|
|
02/13/98 407 - went over corrections with job supper will reinsp latter.
|
INSP - Footings | 12/18/1997 | 12/18/1997 | 12/18/1997 | P | PART |
Russ Owen
|
|
|
set backs and footing width only early start permit.
|