Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-03681
StatusExpired
Name ST LUKE'S CAREPOINT CENTER
Site Address 2051 E SUMMERSWEET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To finish 5,910 SQ FT of a 16,275 sq.ft. existing shell building for a medical exam office per approved plans on file. Work to include construction of interior non-combustible partitions to divide space into individual exam offices, reception area, lab, X-Ray room, accessible restrooms, nurses station, break rooms, adminstration office and entry vestibule. The installation of a suspended ceiling system, construction of a one-hour fire-resistive tenant demising wall from floor to roof deck, Installation of cabinetry and miscelaneous interior finishes, Mechanical, plumbing, and electrical. FINAL INSPECTION AND LETTER OF COMPLETION FOR THE SHELL BUILDING IS REQUIRED BEFORE CERTIFICATE OF OCCUPANCY WILL BE ISSUED. THE REMAINING PORTION OF BUILDING WILL REQUIRE SEPARATE PERMITS FOR OCCUPANCY, AND IS TO REMAIN UNOCCUPIED AND FREE OF STORAGE. NOTE: This building is fully fire sprinklered. ALL MODIFICATIONS TO THE FIRE SPRINKLER SYSTEM SHALL BE PER NFPA#13 AS REQUIRED BY THE FIRE DEPARTMENT. (P.C.#796-97)RMH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/22/19987/22/19987/22/1998PPART
DetailsRuss Owen
07/22/98 407 - temporary on has correction.ll him and he will meet you
INSP - Final7/16/19987/17/19987/17/1998PFAIL
DetailsRuss Owen
left corrections ,......
INSP-Final Inspection7/16/19987/17/19987/17/1998APASS
DetailsRick Jackson
WOULD LIKE ARROUND 11- 11:30 PAUL/ ###-#### occ approved
INSP - Final7/9/19987/9/19987/10/1998PNR
DetailsRuss Owen
07/09/98 407 - left correction notice not ready.
INSP - Final7/7/19987/8/19987/8/1998ANH
DetailsRuss Owen
07/08/98 407 - locked out left note.
INSP-Final Inspection7/7/19987/8/19987/7/1998P
DetailsRick Jackson
paul/ ###-####
INSP - Framing/Rough-in6/30/19987/1/19987/1/1998PPASS
DetailsRuss Owen
07/01/98 407 - ceiling tile/ after 2 paul ###-####
INSP - Framing/Rough-in6/26/19986/26/19986/26/1998PFAIL
DetailsRuss Owen
06/26/98 407 - ceiling grid Paul ###-####
INSP-Sprinkler Rough-in/Hydro6/12/19986/12/19986/12/1998PPART
DetailsJoe Tawney
06/12/98 406 - SPRINKLER HEAD PLACEMENT--NICK ###-#### OK ON ROUGH OF SPKLR HEAD PLACEMENT
INSP - Framing/Rough-in5/21/19985/21/19985/21/1998PPASS
DetailsRuss Owen
letter from StLukes,5/21/97.ok special inspection also notes any portion of the canopy that is in contact with building will be removed and repaired when and if ever the canopy is removed.
INSP - Framing/Rough-in5/19/19985/19/19985/19/1998PFAIL
DetailsRuss Owen
05/19/98 407 - left corrections.
INSP - Framing/Rough-in4/2/19984/2/19984/3/1998PPASS
DetailsRuss Owen
04/02/98 407 - partial inspection of the interior walls.