INSP - Letter of compliance | 5/19/1998 | 5/19/1998 | 5/19/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14594
|
INSP - Letter of compliance | 5/19/1998 | 5/19/1998 | 5/19/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14594
|
INSP - Final | 5/15/1998 | 5/18/1998 | 5/19/1998 | A | PASS |
Russ Owen
|
|
|
05/18/98 407 - Scheduled by Hello!. Contact phone is [8666175].
|
INSP - Final | 5/12/1998 | 5/13/1998 | 5/13/1998 | A | CANC |
Russ Owen
|
|
|
05/13/98 407 - CANCELL ....................................175].
|
INSP - Final | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | FAIL |
Russ Owen
|
|
|
05/12/98 407 - LEFT CORRECTIONS.o!. Contact phone is [8666175].
|
INSP - Energy code compliance | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | PASS |
Russ Owen
|
|
|
03/19/98 407 - Scheduled by Hello!. Contact phone is [8666175].
|
INSP - Framing/Rough-in | 3/16/1998 | 3/17/1998 | 3/17/1998 | A | PART |
Russ Owen
|
|
|
03/17/98 407 - left correction.lo!. Contact phone is [8666175].
|
INSP - Framing/Rough-in | 3/5/1998 | 3/5/1998 | 3/5/1998 | P | PART |
Russ Owen
|
|
|
03/05/98 407 - shear nails, The framing contractor will add some additional fasteners in a few locations. Went over inspection with Bob from Marrs Co. and the framer.
|
INSP - Foundation | 1/9/1998 | 1/12/1998 | 1/12/1998 | A | PASS |
Russ Owen
|
|
|
01/12/98 407 - foundation ok,note hold downs not installed at time of in
|
INSP - Footings | 1/7/1998 | 1/7/1998 | 1/7/1998 | P | PASS |
Russ Owen
|
|
|
|