INSP - Final | 5/12/1998 | 5/13/1998 | 5/13/1998 | P | PASS |
Jim Sly
|
|
|
05/13/98 316 - C/C # 015670
|
INSP - Letter of compliance | 5/13/1998 | 5/13/1998 | 5/13/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 015670
|
INSP - Letter of compliance | 5/13/1998 | 5/13/1998 | 5/13/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 015670
|
INSP - Final | 5/11/1998 | 5/11/1998 | 5/11/1998 | P | FAIL |
Tom Arcoraci
|
|
|
05/11/98 408 - ###-#### access key under front door mat
|
INSP - Energy code compliance | 2/20/1998 | 2/20/1998 | 2/20/1998 | | PASS |
|
|
|
|
INSP - Energy code compliance | 2/19/1998 | 2/20/1998 | 2/20/1998 | P | CANC |
|
|
|
JOHN ###-####. Inspected by 325.
|
INSP - Framing/Rough-in | 2/20/1998 | 2/20/1998 | 2/20/1998 | | PASS |
|
|
|
|
INSP - Framing/Rough-in | 2/19/1998 | 2/20/1998 | 2/20/1998 | P | CANC |
|
|
|
JOHN ###-####. Inspected by 325.
|
INSP - Energy code compliance | 2/17/1998 | 2/18/1998 | 2/18/1998 | P | NR |
Jim Sly
|
|
|
02/18/98 316 - NR.......
|
INSP - Framing/Rough-in | 2/18/1998 | 2/18/1998 | 2/18/1998 | P | FAIL |
Jim Sly
|
|
|
02/18/98 316 - C/N...Misc truss corrections...
|
INSP - Framing/Rough-in | 2/17/1998 | 2/17/1998 | 2/18/1998 | P | CANC |
Wes Worcester
|
|
|
02/18/98 342 - ###-####
|
INSP - Framing/Rough-in | 2/11/1998 | 2/12/1998 | 2/12/1998 | P | PART |
Tom Arcoraci
|
|
|
02/12/98 408 - HEER WALL NAILING--###-#### JOHN engineering at rear bay ok ok to cover rear of house
|
INSP - Framing/Rough-in | 2/6/1998 | 2/6/1998 | 2/6/1998 | P | PART |
Jim Sly
|
|
|
02/06/98 316 - Talked about shear wall ...need engineering.....
|
INSP - Footings | 1/14/1998 | 1/15/1998 | 1/15/1998 | A | PASS |
Jim Sly
|
|
|
01/14/98 316 - Not Ready...setting forms..height, setback, foot width ap
|