INSP - Final | 8/7/1998 | 8/7/1998 | 8/7/1998 | P | PASS |
Russ Owen
|
|
|
LC#15920
|
INSP - Final | 8/3/1998 | 8/5/1998 | 8/6/1998 | P | FAIL |
Russ Owen
|
|
|
08/05/98 407 - reinspection still has a correction,on the riser height a exterior deck stairs.
|
INSP - Final | 7/10/1998 | 7/13/1998 | 7/13/1998 | A | FAIL |
Russ Owen
|
|
|
07/13/98 407 -
|
INSP - Final | 7/9/1998 | 7/10/1998 | 7/11/1998 | A | CANC |
Russ Owen
|
|
|
final verl/ ###-#### re-schedual for 7/12/98.
|
INSP - Energy code compliance | 4/1/1998 | 4/2/1998 | 4/2/1998 | A | PASS |
Russ Owen
|
|
|
04/02/98 407 - ###-#### VERL ì
|
INSP - Framing/Rough-in | 4/2/1998 | 4/2/1998 | 4/2/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - re-insp.
|
INSP - Energy code compliance | 3/27/1998 | 3/30/1998 | 3/27/1998 | A | CANC |
Russ Owen
|
|
|
did the framing inspection 03/27/98,I was there to re-insp mechanical. Contractor was also there he will recall for an insulation inspection when corrections have also been completed.
|
INSP - Framing/Rough-in | 3/27/1998 | 3/27/1998 | 3/27/1998 | P | FAIL |
Russ Owen
|
|
|
I did the inspection when I was out re-inspecting the mechanical ,contractor will call for a re-inspection when insulated and corrctions done.
|
INSP - Foundation | 2/6/1998 | 2/6/1998 | 2/6/1998 | P | PASS |
Russ Owen
|
|
|
called the architect about rebar,plan on site not clear. also told contractors to provide additional clearance. architect said he was going out to look over the job told him to call me if he has any problems.note rebar in all of foundation more than on plan.
|
INSP - Footings | 2/2/1998 | 2/2/1998 | 2/2/1998 | P | PASS |
Russ Owen
|
|
|
02/02/98 407 - exterior footings.
|