Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD98-00003
StatusFinaled
Name STATEWIDE CONSTRUCTION
Site Address 5570 W LAKE RIVER LN
Project Name 
Customer Number 
ePlanReviewNo
Description
TO BUILD A 3051 SF TWO STORY SFD ( 1781 SF 1ST FL; 1270 SF 2ND FL.) WITH AN ATTACHED 1168 SF GARAGE AND 652 SF OF RAISED DECK AREA PER APPROVED PLANS, SPECIFICATIONS AND ENGINEERING. NOTE: THIS HOUSE IS TO BE CONSTRUCTED OF A COMPOSITE OF WOOD FRAMED UPPER FLOOR AND AN ENG'D STRUCTURAL BRICK SYSTEM (SUPR-KING) FOR THE EXTERIOR BEARING 1ST FL WALLS PER ATTACHED ENGINEERING AND BRICK MANUF'S SPECIFICATIONS. ACHD#98-0520 PC#003. 340CD.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final2/5/19992/5/19992/5/1999PPASS
DetailsWes Worcester
02/05/99 342 - ###-#### brian\\the code is *5575
INSP - Final12/18/199812/18/199812/18/1998PFAIL
DetailsCarl Dependahl
BRIAN ###-#### GATE CODE *5575 PER 325 need listing/ NFPA documents for non-std. smoke det system, etc.
INSP - Energy code compliance8/14/19988/14/19988/14/1998PPASS
DetailsWes Worcester
/ / 342 - *5575 gate entrance code brian ###-####
INSP - Framing/Rough-in8/13/19988/14/19988/13/1998APART
DetailsWes Worcester
08/13/98 342 - bryan ###-#### turret ok to cover
INSP - Framing/Rough-in8/10/19988/11/19988/11/1998APASS
DetailsWes Worcester
08/11/98 342 - brian ###-#### `~
INSP - Foundation7/8/19987/14/19987/8/1998ACANC
DetailsWes Worcester
Scheduled by Hello!. Cancelled by Hello! (Last update by [HLO]).
INSP - Framing/Rough-in6/17/19986/18/19986/18/1998AFAIL
DetailsWes Worcester
06/18/98 342 - BRIAN ###-#### after velectrical need to shr and transfer
INSP - Concrete4/24/19984/23/19984/23/1998PNR
DetailsCarl Dependahl
no insp, conf w/ steve of custom masonry
INSP - Concrete4/17/19984/16/19984/16/1998PNR
DetailsCarl Dependahl
no insp; conf w/ mason re plan and c/n
INSP - Framing/Rough-in4/9/19984/10/19984/10/1998AFAIL
DetailsWes Worcester
need enginering for hold down, anchor bolts and mud sill installation
INSP - Concrete4/10/19984/9/19984/9/1998PNR
DetailsCarl Dependahl
no insp ... conf. w/ mason re supr-king brick
INSP - Framing/Rough-in4/7/19984/8/19984/8/1998APART
DetailsCarl Dependahl
###-#### MATT...k web at front & side ok t continue
INSP - Concrete4/8/19984/7/19984/7/1998PNR
DetailsCarl Dependahl
no insp, conf w/ mason on struct brick insp's
INSP - Framing/Rough-in4/6/19984/6/19984/6/1998PPASS
DetailsWes Worcester
04/06/98 342 - ###-#### witnesses epoxy set, and depth of holes for reba
INSP - Framing/Rough-in4/3/19984/3/19984/3/1998PPART
DetailsWes Worcester
04/03/98 342 - ###-####
INSP - Framing/Rough-in4/2/19984/3/19984/3/1998APART
DetailsWes Worcester
04/02/98 342 - MASONRY MATT ###-####
INSP - Framing/Rough-in4/1/19984/2/19984/2/1998APART
DetailsWes Worcester
/ / 342 - MATT ###-####
INSP - Concrete4/1/19984/1/19984/1/1998PPART
DetailsCarl Dependahl
not insp, conf. w/ Marlene
INSP - Concrete3/31/19983/31/19983/31/1998PPART
DetailsCarl Dependahl
need to insp rebar & ladder wire horizontal...ok at rear & side walls, up to 9 courses at front
INSP - Framing/Rough-in3/30/19983/31/19983/31/1998AFAIL
DetailsWes Worcester
03/31/98 342 - MATT ###-#### OFFICE ###-#### full pg-STEEL REINFORCEMENT
INSP - Concrete3/19/19983/19/19983/19/1998PNR
DetailsCarl Dependahl
conf w/ STEVE OF PINNACLE ENG. RE FOUND REQ'S...KEEP SWO
INSP - Concrete3/16/19983/16/19983/16/1998ANR
DetailsCarl Dependahl
chk'd job, swo placed 3-13
INSP - Stop Work Order3/13/19983/13/19983/13/1998APASS
DetailsCarl Dependahl
need permit to proceed beyond fnd
INSP - Concrete3/12/19983/12/19983/12/1998AFAIL
DetailsCarl Dependahl
met w/ STATEWIDE, MASON, OWNER; NEED FURTHER ENG'G AND INSP SCHEDULE. FND POURED.
INSP - Concrete3/10/19983/10/19983/10/1998ANR
DetailsCarl Dependahl
conf w/ Brian of Statewide re insp's for fnd & masonry....need manuf's specs for proposed install method of reinf for masonry
INSP - Concrete3/6/19983/6/19983/6/1998PNR
DetailsCarl Dependahl
met w/ statewide const, mason & Dale Yarborough of Gen'l Shale...discussed submittal, need new specs for install of reinf. & ner or eng'g
INSP - Concrete3/4/19983/5/19983/5/1998PFAIL
DetailsCarl Dependahl
###-####...POURED; PROPOSED STRUCT BRICK HOUSE, PERMIT NOT ISSUED; NO BAR EXTENSIONS, SILL ANCHOR BOLTS ONLY????TO MEET GEN'L FRI P.M.
INSP - Foundation3/4/19983/4/19983/4/1998ANR
DetailsCarl Dependahl
NOT FDN INSP, DISCUSSED PLAN & FDN REQ'S W/ BRIAN OF STATEWIDE
INSP - Concrete2/20/19982/23/19982/23/1998AFAIL
DetailsWes Worcester
02/23/98 342 - statewide ###-#### no access code for gate, no answer at