INSP - Final | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | PASS |
Wes Worcester
|
|
|
04/15/98 342 - re-brian ###-####
|
INSP - Final | 4/14/1998 | 4/14/1998 | 4/14/1998 | P | NR |
Wes Worcester
|
|
|
04/14/98 342 - ###-#### BRIAN need electrical inspection
|
INSP - Energy code compliance | 3/4/1998 | 3/5/1998 | 3/5/1998 | A | PASS |
Wes Worcester
|
|
|
03/05/98 342 - Scheduled by Hello!. Contact phone is [8613948].
|
INSP - Framing/Rough-in | 3/5/1998 | 3/5/1998 | 3/5/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - installed bracing per specs
|
INSP - Energy code compliance | 3/3/1998 | 3/4/1998 | 3/4/1998 | A | NR |
Wes Worcester
|
|
|
03/03/98 342 - Scheduled by Hello!. Contact phone is [8613948].
|
INSP - Framing/Rough-in | 3/4/1998 | 3/4/1998 | 3/4/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 3/4/1998 | 3/4/1998 | 3/4/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 2/27/1998 | 3/2/1998 | 3/2/1998 | A | NR |
Wes Worcester
|
|
|
03/02/98 342 - BRIAN ###-####
|
INSP - Framing/Rough-in | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | PASS |
Wes Worcester
|
|
|
02/27/98 342 - BRIAN ###-#### 9 am apt PD 42.00 RE-INSPECTION FEE
|
INSP - Framing/Rough-in | 2/26/1998 | 2/26/1998 | 2/26/1998 | P | FAIL |
Tom Arcoraci
|
|
|
BRIAN ###-#### no approved plans on site no truss eng on site contractor asked for this inspection by phone to 408 for am inspection because he had called for the wrong permit number he called for bld97-3155 which already has a frame inspection done i told him to call it in for a pm and i would do for him now
|
INSP - Framing/Rough-in | 2/23/1998 | 2/24/1998 | 2/24/1998 | A | NR |
Wes Worcester
|
|
|
02/24/98 342 - BRIAN ###-#### no electrical, need plans and engineering
|
INSP - Footings | 1/21/1998 | 1/21/1998 | 1/21/1998 | P | PASS |
Wes Worcester
|
|
|
01/21/98 342 -
|