BLD-Final | 9/22/2000 | 9/22/2000 | 9/22/2000 | A | PASS |
|
|
|
signed perm col of occ req card, done
|
Permanent Occupancy | | 9/22/2000 | 9/22/2000 | | DONE |
|
|
|
|
INSP - Final | 12/14/1998 | 12/14/1998 | 12/14/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 10/22/1998 | 10/21/1998 | 10/22/1998 | | PART |
|
|
|
/ / 338 - BOND FOR P/Z RECIEVED SIGNED TEMP COL FOR CODE ENF. AND STR.
|
INSP - Final | 10/7/1998 | 10/8/1998 | 10/8/1998 | P | PART |
|
|
|
10/08/98 338 - made ok with p/z approval and bond set
|
INSP-Final Inspection | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | PART |
Joe Tawney
|
|
|
10/08/98 406 - dirk ###-#### FINAL OK FOR TEMP OCC FIRE HYD BARRICADE SIGNAGE ì
|
INSP - Wall cover | 6/9/1998 | 6/9/1998 | 6/9/1998 | | PART |
|
|
|
/ / 338 - MADE OK FOR THE EXT LAYER OF DRYWALL ON THE RATED PROP LINE
|
INSP - Framing/Rough-in | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | NR |
|
|
|
06/08/98 338 - firewall butch ###-#### not ready no answer on the call #
|
INSP - Concrete | 5/5/1998 | 5/6/1998 | 5/6/1998 | A | PART |
|
|
|
05/06/98 338 - made ok r-bar for the headers placed
|
INSP - Foundation | 4/29/1998 | 4/30/1998 | 4/30/1998 | P | PASS |
|
|
|
MADE OK R-BAR PLACED5 / masonry insp.
|
INSP - Foundation | 4/29/1998 | 4/29/1998 | 4/29/1998 | | PART |
|
|
|
04/30/98 338 - ok to pour bond beams r-bar is placed
|
INSP - Foundation | 4/29/1998 | 4/29/1998 | 4/29/1998 | | PART |
|
|
|
04/30/98 338 - ok to pour bond beams r-bar is placed
|
INSP - Foundation | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | PASS |
|
|
|
04/16/98 338 - r-bar placed foundation wall
|
INSP - Concrete | 4/2/1998 | 4/3/1998 | 4/3/1998 | A | PASS |
|
|
|
04/03/98 338 - made ok r-bar placed
|