BLD-Final | 9/22/2000 | 9/22/2000 | 9/22/2000 | A | PASS |
|
|
|
done, signed the perm col of the occ req card
|
Permanent Occupancy | | 9/22/2000 | 9/22/2000 | | DONE |
|
|
|
|
INSP - Final | 12/14/1998 | 12/14/1998 | 12/14/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 10/21/1998 | 10/21/1998 | 10/21/1998 | | PART |
|
|
|
/ / 338 - BOND FOR P/Z RECIEVED SIGNED FOR P/Z AM AND STR
|
INSP - Final | 10/7/1998 | 10/8/1998 | 10/8/1998 | P | PART |
|
|
|
10/08/98 338 -
|
INSP-Final Inspection | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | PART |
Joe Tawney
|
|
|
10/08/98 406 - dirk ###-#### FINAL OK FOR TEMP OCC FIRE HYD BARRICADE SIGNAGE ì
|
INSP - Wall cover | 6/9/1998 | 6/9/1998 | 6/9/1998 | | NR |
|
|
|
/ / 338 - FIRE WALL RESCEDULED FOR 06-09-98
|
INSP - Framing/Rough-in | 6/8/1998 | 6/8/1998 | 6/9/1998 | P | PART |
|
|
|
06/08/98 338 - fire wall butch ###-#### made ok no answer on the access
|
INSP - Foundation | 4/29/1998 | 4/30/1998 | 4/30/1998 | P | PASS |
|
|
|
MADE OK TO POUR R-BAR PLACEDry insp.
|
INSP - Foundation | 4/29/1998 | 4/29/1998 | 4/29/1998 | | PART |
|
|
|
04/30/98 338 - r-bar placed ok to pour bond beams
|
INSP - Foundation | 4/29/1998 | 4/29/1998 | 4/29/1998 | | PART |
|
|
|
04/30/98 338 - r-bar placed ok to pour bond beams
|
INSP - Framing/Rough-in | 4/28/1998 | 4/28/1998 | 4/28/1998 | P | PASS |
|
|
|
masonary curtis ###-####-1025
|
INSP - Foundation | 4/16/1998 | 4/17/1998 | 4/17/1998 | A | PASS |
|
|
|
04/17/98 338 - R-BAR PLACED foundation wall - dirk ###-####
|
INSP - Foundation | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | PASS |
|
|
|
04/16/98 338 - r-bar placed made ok footing
|