Permanent Occupancy | | 9/26/2000 | 9/26/2000 | | DONE |
|
|
|
|
INSP - Final | 12/14/1998 | 12/14/1998 | 12/14/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 10/21/1998 | 10/21/1998 | 10/21/1998 | | PART |
|
|
|
/ / 338 - P/Z BOND RECIEVED; SIGNED THE TEMP COL FOR STR AND P/Z
|
INSP - Final | 10/7/1998 | 10/8/1998 | 10/8/1998 | P | PART |
|
|
|
10/08/98 338 - made ok for temp occ with p/z approval and bond placement
|
INSP-Final Inspection | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | PART |
Joe Tawney
|
|
|
10/08/98 406 - dirk ###-#### FINAL OK FOR TEMP OCC FIRE HYD BARRICADE SIGNAGE ì
|
INSP - Framing/Rough-in | 8/10/1998 | 8/11/1998 | 8/11/1998 | A | PART |
|
|
|
08/11/98 338 - made ok
|
INSP - Wall cover | 5/13/1998 | 5/14/1998 | 5/14/1998 | A | PART |
|
|
|
05/14/98 338 - r-bar placed ok to bour
|
INSP - Foundation | 5/7/1998 | 5/7/1998 | 5/7/1998 | P | PART |
|
|
|
05/07/98 338 - re-bar made ok
|
INSP - Foundation | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | PART |
|
|
|
05/05/98 338 - MADE OK R-BAR PLACED
|