Permanent Occupancy | | 9/22/2000 | 9/22/2000 | | DONE |
|
|
|
|
INSP - Final | 12/14/1998 | 12/14/1998 | 12/14/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 10/21/1998 | 10/21/1998 | 10/21/1998 | | PART |
|
|
|
/ / 338 - RECIEVED BOND FROM P/Z; SIGNED TEMP COL FOR P/Z AND STR.
|
INSP - Final | 10/7/1998 | 10/8/1998 | 10/8/1998 | P | PART |
|
|
|
10/08/98 338 - made ok for temp occ with p/z approval and bond set
|
INSP-Final Inspection | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | PART |
Joe Tawney
|
|
|
10/08/98 406 - dirk ###-#### FINAL OK FOR TEMP OCC FIRE HYD BARRICADE SIGNAGE
|
INSP - Framing/Rough-in | 8/10/1998 | 8/11/1998 | 8/11/1998 | A | PART |
|
|
|
08/11/98 338 - made ok
|
INSP - Foundation | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | PART |
|
|
|
05/05/98 338 - made ok for the r-bar inthe concrete headers also
|
INSP - Concrete | 4/24/1998 | 4/24/1998 | 4/27/1998 | P | PASS |
|
|
|
04/28/98 338 - made ok to pour r-bar is placed masonary curtis ###-####-
|
INSP - Wall cover | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | PASS |
|
|
|
made ok to pour r-bar placed
|