INSP - Final | 9/15/1998 | 9/15/1998 | 9/15/1998 | P | FAIL |
Tom Arcoraci
|
|
|
09/15/98 408 - BRIAN ###-#### FOR FN INSP not ready went back at 4:30 still not ready
|
INSP - Final | 9/14/1998 | 9/14/1998 | 9/15/1998 | P | FAIL |
Tom Arcoraci
|
|
|
09/14/98 408 - BRIAN ###-#### FN INSP
|
INSP - Final | 9/9/1998 | 9/10/1998 | 9/10/1998 | P | FAIL |
Tom Arcoraci
|
|
|
09/10/98 408 - BRIAN ###-#### not ready
|
INSP - Framing/Rough-in | 5/27/1998 | 5/27/1998 | 5/27/1998 | P | PASS |
Bob Archibald
|
|
|
CN made ok.
|
INSP - Framing/Rough-in | 5/18/1998 | 5/18/1998 | 5/18/1998 | P | FAIL |
Tom Arcoraci
|
|
|
05/18/98 408 - re-inspection paid C/N ITEMS NOT COMPLETED
|
INSP - Framing/Rough-in | 5/8/1998 | 5/8/1998 | 5/8/1998 | P | FAIL |
Tom Arcoraci
|
|
|
05/08/98 408 - ###-####
|
INSP - Framing/Rough-in | 5/6/1998 | 5/6/1998 | 5/7/1998 | P | FAIL |
Tom Arcoraci
|
|
|
/ / 408 - ###-#### no correction notice on site for re inspect
|
INSP - Framing/Rough-in | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | NR |
Tom Arcoraci
|
|
|
BRAIN/###-#### - FRAMING INSP. FOR LATE AM.
|
INSP - Framing/Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | P | FAIL |
Jim Sly
|
|
|
05/05/98 316 - C/N...Install HD's per engineering.....
|
INSP - Framing/Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | | NR |
Tom Arcoraci
|
|
|
05/05/98 408 - BRAIN/###-#### - FRAMING INSP. FOR LATE AM. no approved plans
|
INSP - Foundation | 3/12/1998 | 3/12/1998 | 3/12/1998 | P | PART |
Jim Sly
|
|
|
03/12/98 316 - Foot and found Pour W/O in...Heigh, foot width & soil OK
|