INSP - Energy code compliance | 8/14/1998 | 8/14/1998 | 8/17/1998 | P | PASS |
Jim Storey
|
|
|
08/14/98 301 - ###-#### reinspection
|
INSP - Energy code compliance | 8/4/1998 | 8/4/1998 | 8/5/1998 | P | FAIL |
Jim Storey
|
|
|
08/04/98 301 - MATT ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ì
|
INSP - Framing/Rough-in | 7/22/1998 | 7/22/1998 | 7/23/1998 | P | FAIL |
Jim Storey
|
|
|
07/22/98 301 - MATT VAKILLI ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 7/8/1998 | 7/8/1998 | 7/9/1998 | P | FAIL |
Jim Storey
|
|
|
07/08/98 301 - needs framing passed/waiting to insulate matt ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED no mech done no framing prefo
|
INSP - Framing/Rough-in | 5/11/1998 | 5/11/1998 | 5/11/1998 | P | PART |
Jim Storey
|
|
|
05/11/98 301 - FIRE WALL OK
|
INSP - Framing/Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | P | PART |
Jim Storey
|
|
|
05/05/98 301 - FRWL-RATED WALL CONST. OK
|
INSP - Framing/Rough-in | 4/28/1998 | 4/28/1998 | 4/28/1998 | P | PART |
Jim Storey
|
|
|
04/28/98 301 - 2nd floor fire wall center of bldg ok only part of wall i
|
INSP - Framing/Rough-in | 4/20/1998 | 4/21/1998 | 4/21/1998 | A | PART |
Jim Storey
|
|
|
04/21/98 301 - floor line pony wall ok for gyp atchment 12 inch wall hei
|
INSP - Framing/Rough-in | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | PART |
Jim Storey
|
|
|
04/15/98 301 - gyp nailling on first floor ok at p/l wall 2 -1 hr
|
INSP - Framing/Rough-in | 4/10/1998 | 4/10/1998 | 4/13/1998 | P | CANC |
Jim Storey
|
|
|
04/13/98 301 - work in progess no insp.MATT ###-#### REINSPECTION
|
INSP - Framing/Rough-in | 4/10/1998 | 4/10/1998 | 4/10/1998 | | PART |
Jim Storey
|
|
|
04/10/98 301 - FRWL-RATED WALL CONST. OK at crawi space only
|
INSP - Framing/Rough-in | 4/9/1998 | 4/9/1998 | 4/9/1998 | P | FAIL |
Jim Storey
|
|
|
This permit is for duplex construction w/1hr walls for future conversion to townhouse. Report of improper joist layout at future property line. C/N ON SITE DO NOT COVER FLOOR
|