BLD-Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | CANC |
Tony Young
|
|
|
FN OCC- FOR HOMEOWNER ROBERT-- ###-####--CANCEL PER H/O
|
BLD-Final | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | PASS |
Steven Webb
|
|
|
Robert Lewis ###-####: //c.of .c issued 11/14/2000 1:06:35 PM
|
BLD-Grading Inspection | 10/17/2000 | 10/17/2000 | 10/17/2000 | | PASS |
Rita DeYoung
|
|
|
Final grading has been approved by the engineer.
|
BLD-Final | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | NR |
Tom Arcoraci
|
|
|
Robert ###-#### NOT READY 10/16/2000 3:32:21 PM
|
BLD-Framing/Rough-in | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/16/2000
|
BLD-Energy code compliance | 4/6/2000 | 4/6/2000 | 4/6/2000 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/24/2000 | 3/27/2000 | 3/27/2000 | P | PASS |
Wes Worcester
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/9/1999 | 11/15/1999 | 11/9/1999 | P | CANC |
Russ Owen
|
|
|
Robert Lewis ###-#### cell ###-####--PER ROBERT CANCEL
|
INSP - Framing/Rough-in | 8/2/1999 | 8/2/1999 | 8/2/1999 | P | PART |
Russ Owen
|
|
|
08/02/99 407 - added some lower panel blocking at shaer walls.
|
INSP - Framing/Rough-in | 7/23/1999 | 7/26/1999 | 7/26/1999 | P | PART |
Russ Owen
|
|
|
07/26/99 407 - exterior has been covered,with no inspection,only hold do
|
INSP - Foundation | 4/19/1999 | 4/26/1999 | 4/26/1999 | A | PASS |
Wes Worcester
|
|
|
04/26/99 342 - ###-#### ROBERT//FOOTING FOR DECK 11:00 PLEASE
|
INSP - Foundation | 4/16/1999 | 4/19/1999 | 4/19/1999 | A | FAIL |
Wes Worcester
|
|
|
04/19/99 342 - around 11-12 pm please as per wes/robert ###-#### pads for decks
|
INSP - Framing/Rough-in | 12/30/1998 | 12/31/1998 | 12/31/1998 | A | PART |
Wes Worcester
|
|
|
12/31/98 342 - ROBERT ###-####
|
INSP - Foundation | 12/15/1998 | 12/16/1998 | 12/16/1998 | A | PASS |
Wes Worcester
|
|
|
ASAP PLEASE..BOB ###-####
|
INSP - Foundation | 12/11/1998 | 12/15/1998 | 12/15/1998 | A | FAIL |
Wes Worcester
|
|
|
12/15/98 342 - ROBERT ###-#### rebar in dirt
|
INSP - Foundation | 11/2/1998 | 11/3/1998 | 11/3/1998 | A | NR |
Wes Worcester
|
|
|
11/03/98 342 - JED ###-####-20153
|
INSP - Foundation | 11/3/1998 | 11/3/1998 | 11/3/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - 9am apt
|
INSP - Foundation | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | NR |
Carl Dependahl
|
|
|
342 area, took for al...still need eng's letter for modifcations &/or soils compaction.
|
INSP - Foundation | 10/29/1998 | 10/30/1998 | 10/30/1998 | A | CANC |
Alan Hauser
|
|
|
10/30/98 350 - contractor to call carl d.
|
INSP - Foundation | 10/30/1998 | 10/30/1998 | 10/30/1998 | A | PART |
Carl Dependahl
|
|
|
conf only, not insp, spoke w/ Bob Arnold...will fax his ok for soils and modifications from original geotech recommendations. need for pour.
|
INSP - Foundation | 10/28/1998 | 10/29/1998 | 10/29/1998 | P | FAIL |
Carl Dependahl
|
|
|
JED ###-#### 20153...342 area, need eng's statement of acceptance for soils compaction, apparently modified from initial geo-tech report by Bob Jones, as per followup by Bob Arnold of EISI, who recommended lowering ftgs to native soils. Also spoke w/ struct eng, Riley Mahaffey of Atwood/Hinzman/Jones, requested statement that concrete special insp not req'd due to 2500psi "design", called out as 3000psi on plan...Another can of worms.
|